"B" Mill Excavation 23"ULD 36-240 and 241, 12" EA 36-009 central N.S. rd. looking S.E.
Excavation E.W. corridor power-recaust 4"ES, 24" EMC-36-061 MH3B, Gas 10"GF MH.
Excavation E.W. corridor power-recaust 4"ES, 24" EMC-36-061 MH3B, Gas 10"GF West.
"B" Mill digester. Kamyr/Horton vertomatic welder.
E.W. corridor between power and recaust showing 24"EMUC & 10"GF, looking N.E.
"B" Mill Recovery Bldg. lifting 1st economizer tube bundles to correct elevators looking west.
Recaust - Piping between W.L.S. Tank and #3 L.M.W. Tank looking N.W.
Insulate 1/2" 0 steam trace line existing from 4" 0 mud line going to 30" 0 EAS line from "A" mill pulp. grp. looking N.W.
"B" Mill Pulping Group lifting section of Caustic Tower #20 in place looking N.
"B" Mill Pulping Group temporary digester Tower hoist block looking N.E.
"B" Mill Machine Room steel beam bracket at column MA X 56.
"B" Mill Machine Room Temporary Steam Heaters at Column MXA X 62 looking S.E.
"B" Mill Pulping Group temporary Digester Tower hoist looking N.W.
Rebuilt foam tower looking S.E.
"A" Mill Machine Room roof looking S. along E. wall.
"B" Mill Power Group. Trench formwork along E. wall of "A" Mill Power Group looking N.W.
"B" Mill Pulping Group Bleach Towers #10 and #20 from Track #9 looking N.W.
Foundation for utility bridge tower #5 looking S.E.
Gravel stock pile from W. end looking S.E.
"B" Mill Pulping Group, Digester Tower, N. wall looking S.
"B" Mill Pulping Group Digester cladding W. wall from N.W. road looking E.
No. 2 Rail Car Chip Dumper Tunnel excavation looking N.E.
"A" Mill Bleached Stock Spill near "B" Mill Machine Room Reactor Pit looking S.E.
Heating registers thru W. wall "A" Mill Machine Room into "B" Mill Machine Room looking S.E.
Heating registers thru W. wall "A" Mill Machine Room into "B" Mill Machine Room looking S.E.
"B" Mill Machine Room, S. wall looking N.E.
No. 2 Rail Car Chip Dumper Tunnel excavation looking.
No. 2 Rail Car Chip Dumper abandoned blow line sections looking N.E.
No. 2 Rail Car Chip Dumper Tunnel Excavation looking N.W.
No. 2 Rail Car Chip Dumper Tunnel Excavation looking N.E.
No. 2 Rail Car Chip Dumper Tunnel Excavation looking N.
No. 2 Rail Car Chip Dumper Tunnel Excavation looking S.
"B" Mill Machine Room looking N.W.
"B" Mill Machine Room Sample Storage Room looking S.W.
"B" Mill Pulping Group. 13'-6X26'-0 Bleached stock vacuum washer drum.
"B" Mill Pulping Group. Impco single shaft steam mixers.
"B" Mill Power Group looking S.W.
"B" Mill Pulping Group looking N.E.
Water Treatment Clarifier looking S.E.
"B" Mill Power Group from Track #14 looking N.
"B" Mill Power Group E. Wall looking N.W.
"B" Mill Power Group looking N.W.
Lime Kiln Piers from track #14 looking N.W.
"B" Mill Machine Room from N-S road looking N.E.
"B" Mill Pulping Group from N-S road looking N.E.
Roof beams for "B" Mill Pulping Group looking N.W.
"B" Mill Pulping Group from track #9 looking N.W.
"B" Mill Pulping Group from near Woods Div. Bldg. looking South E.
Weather protection cover for welding digester sections.
Soap Skimming and Storage Tanks from F.O. Day Tank dyke looking S.W.