An aerial of Northwood Pulp Mill during the expansion with the construction occurring in the foreground.
An aerial of Northwood Pulp Mill during the expansion with the digester towers in the background and the mill complex in the foreground.
An aerial of Northwood Pulp Mill during the expansion.
The construction of the digester tower during the expansion of the pulpmill.
The Pulpmill expansion of the digester tower.
Bob Rinaldi inside the new digester building.
Dennis Matson, Member of Expansion Team and Technical Superintendent, stands beside a row of washer drums.
"B" Mill Pulping Group looking North West.
"B" Mill Pulping Group looking North East.
Roof of weather protection enclosure for welding up digester sec.
42" 0 FRP Lagoon Inlet Pipe at Splitter Box End looking S.E.
"B" Mill Pulping Group from Track #14 looking North West.
Lime Kiln Section looking South East.
Lime Kiln Piers from N. end looking South West.
"B" Mill Machine Room from near Locker Room looking North East.
Capacitor room from N.E. corner looking South West.
Soap Skimming and Storage Tanks from F.O. Day Tank dyke looking S.W.
"B" Mill Power Group looking South West.
Weather protection cover for welding digester sections.
"B" Mill Pulping Group from near Woods Div. Bldg. looking South E.
"B" Mill Machine Room from W. road looking South East.
"B" Mill Pulping Group from track #9 looking N.W.
Roof beams for "B" Mill Pulping Group looking N.W.
"B" Mill Pulping Group from N-S road looking N.E.
"B" Mill Pulping Group from S.W. Corner looking N.E.
"B" Mill Machine Room from near Locker Room looking N.E.
"B" Mill Machine Room from N.W. Corner looking S.E.
"B" Mill Machine Room from N-S road looking N.E.
Lime Kiln Piers from track #14 looking N.W.
Unloading steel for #2 Turbo-Generator building looking N.W.
"B" Mill Machine Room low bay lighting looking S.
"B" Mill Machine Room Ballast Bank looking W.
"B" Mill Machine Room Ballast Bank looking W.
Contractors parking lot looking N.
"B" Mill Power Group from track #14 looking N.
Excavation at #2 Rail Car Chip Dumper looking S.E.
"B" Mill Power Group looking N.W.
"B" Mill Pulping Group Bridge Crane looking N.W.
"B" Mill Pulping Group, Digester Tower S. side looking N.
Water Treatment Clarifier looking S.W.
Water Treatment Clarifier looking S.E.
New Lime Kiln Section near Track #14 looking N.E.
No. 2 Rail Car Chip Dumper tunnel excavation looking N.E.
No. 2 Rail Car Chip Dumper tunnel excavation looking N.E.
"B" Mill Pulping Group Bridge Crane looking N.W.
No. 2 Turbo-Generator building framing from S.W. corner looking N.E.
"B" Mill Power Group E. Wall looking N.W.
"B" Mill Power Group from Track #14 looking N.
Water Treatment Clarifier looking S.E.
Water Treatment Clarifier looking S.E.