Aerial of land cleared for Northwood construction.
Bulldozer leveling land.
Section of cleared land against a forest backdrop, piles of logging debris being burnt in preparation for Northwood construction.
Aerial of land being cleared and debris burnt in preparation for Northwood construction.
First few loads of chip at Northwood.
(L-R) Al MacPhearson (engineer) and Bill Hickey (1st Union President, Local 603) stand beside British Columbia Forest Products Limited No. 1 locomotive.
Chip railcar unloading at Northwood in the winter.
Chip railcar unloading at Northwood in the winter.
Preparatory welding to the digester (?)
Seam welding on the recaustizing tanks.
Profile of locomotive on track.
Placing outside wall to shap (?) and stone build.
Aerial of Security and front office under construction.
Profile of British Columbia Forest Products Limited No. 1 locomotive.
Carpenter crew cutting forms for top section of pulper.
Reinforceing steel crew on area 2 of pulper.
Forming base for tanks onlower floor of recovery building.
Close-up of reinforcing steel crew on top of pulper and digester.
Reinforcing steel crew on top of pulper and digester.
Reinforceing crew on top floor of pulper.
Setting welding work crew (?) in position on top floor of pulper building.
Crane lifting a steel girder into the air as two steel workers stand by.
Two unidentified men reading a blueprint, mill construction in background.
Carpenter crew at work.
(L-R): Morris Powel (Pulp & Group Operator), seated is Floyd Blanchard (Tour foreman), and Roy Fujikawa (Pulp & Group Operator in the Pulp and Group control room prior to the mill expansion.
Visible: woodroom, log decks, back end of lime kiln with two chip dumps, water clarifier and water treatement plant, line of railcars.
Forklift moving bales in the pulp mill warehouse; PGE railcars visible in background.
Jim Sai in control room.
chip silos, chip piles and roadway next to chip piles.
Close up of log being debarked in the barking machine.
Overview of washer line.
Log stacker hauling logs to the wood room.
CN railcar unloading chips.
Flakt air pulp dryer.
Brown stock decker.
Overview of the pulp mill warehouse; CN railcars visible.
Log decks - chip piles and pulp mill in background.
Stacked, wrapped and tied bales of pulp.
Unidentified employee working on the baling line.
Brown stock washer.
Preparing land for construction of bio-basin.
Unidentified scientist at work in a lab.
Dr.Joe Mueller.
Dr.Joe Mueller (left) standing with Paul Temoin.
Preparing land for construction of bio-basin.
Unidentified scientist at work in a lab.