Clmap on 8" WFP-47-100 E-W run next to thrust block at SW corner of campsite.
Stockpiling pit run from SE corner of old gravel pit looking NE.
36" WMC-36-140 at S limit of contract 401.
Laying 3-1/2" GF-47-301 along E 46+79 in camp, looking N.
36" WMC-36-144 at cross connection looking SW.
36" WMC-36 & 24" WMC-36 - looking South from near Foam Tower.
Chlorination retention tank being lowered into place. Looking SE.
14" FRP EA line connection into MH#.
Pit run stockpile - looking N.
14" FRP EA line - looking North from MH #24.
Footings for track supports over 30" EC-36-040 & 30"EM-36-060 looking North.
Pit run stockpile - looking W.
14" FRP EA line - looking North from MH #24.
Drain pit #2 on 24" WMC-36-142 at N58 + 64 - looking NW.
WMC crossover connection looking SW.
WMC crossover connection - looking NE.
EAS mixing tank - location looking North.
36" VMC-36-140 excavation at N63 + 45 looking NW.
Track supports over 30" EC-36-040 & 30 EM-36-060 looking NW.
Track supports over 30" EC-36-040 & 30" EM-36-060 - looking NW.
Track 1A looking South from In-Motion-Scale.
Effluent discharge.
Gravel pit from SW corner - looking NE.
Blowout at or near tie-in for 8" WFP-47-100 at SE corner of camp.
Effluent discharge.
36" WMC-36-140 looking SE from N63 + 75.
Looking NE from top of pit run stockpile.
Looking South from tp of pit run stockpile.
Looking West from top of pit run stockpile.
Break in WFP line near 8" WFP-47-100 tie-in at SE corner of camp looking NE.
Looking down on break in WFP line near 8" WFP-47-100 tie-in at SE corner of camp looking NE.
Pit run & 3/4" minus stock piles looking NE. Pile driving rig for W. bridge at R.
WFP tie-in at N53 + 47 x E49 + 90 looking East.
DPV #10 house East of Power Group looking N.
GF line laid in trench looking South from pipe bridge tower.
8" WFP AC pipe from existing line at SE corner of camp.
8" WFP AC pipe from existing line at SE corner of camp.
WFP tie-in at N50 + 81 x E49 + 90 looking East.
Excavation for pump lines betwen camp ES lift station and spirogester.
Influent and effluent boxes for Spirogester.
View from H.A. Simons field office window.
Looking E. along trench for 24" WMC-36-141. 36" WMC-36-140 & 10" GF-36-120.
30" EM-30-060 & 30" EC-36-060 at track supports for Track 9 looking North.
8" WMC branch to recaust off of 24" WMC-36-141 looking NE.
Looking East along trench between Power Group & Recaust.
Winter bridge across Fraser River.
Base for EM MH at West end of 24:EM-35-061 looking North.
24" WMC-36-142 at West end - looking East.
Trench for 8" WFP-36-120 from N66 + 55 looking south.
Trench for 24" WMC-36-141, 24" WMC-36-061 & 10" GF-36-204 at E. end looking West.