Lime kiln precipitator fndn. looking NE.
"B" mill Power Gr. from track #14 looking NW.
EAS neutralization tank from N. end looking S.
Rerouted fuel oil lines at NE. corner of "A" mill Power Group looking S.
Retaining wall at S. end of track #14 looking NW.
Rerouted fuel oil at track #14. Concrete valve chamber looking N.
Rerouted fuel oil lines at track #14. Concrete valve chamber looking SW.
Tie-in location at N. end 10" WFP-36-127 looking SE.
First steel new warehouse addition NW. corner looking SW.
Location of wall section removed between "A" mill bleach plant and machine room looking SW.
"B" mill Pulping Group E. side looking S.
Looking N. along W. wall of new warehouse addition from roof of "A" mill machine room.
"A" mill Power Group transformers room on W. side of building looking W.
"B" mill Power Group from platform at SE. corner of "A" mill Power Group looking NE.
Mill from hill on Pulp Mill Road looking NE. 105mm lens.
Mill from hill on Pulp Mill Road looking NE. 50mm lens.
Track #17 and #18 from N. end of warehouse addition looking N.
Warehouse addition from NE. corner looking SW.
Discharging W.W. from bleach plant into "A" mill machine room floor trench.
"B" mill machine room S. end from roof of "A" mill machine room looking S.
S. end of warehouse addition roof from existing warehouse roof looking SW.
Looking S. from S. end of warehouse roof.
Fndn. ring far 42' swing tank from under lime kiln looking SW.
Framework for fndn. for 30' L.M.S. tank from roof of existing 45' O.L.S. tank looking NE.
"B" mill Pulping Group, N. end from roof of "A" mill Pulping Group looking SW.
"B" mill Power Group from walkway at SW. corner of "A" mill Power Group looking NE.
Acid neutralization tank from E. side looking SW.
Damaged 15KV 250MCM cable.
Trench for 15KV 250MCM cable to water treatment plant from road looking E.
Pouring foundations for "B" mill recovery boiler precipitators from NW. corner looking SE.
N. end of "B" mill Pulping Group from top of chemical unloading shed looking W.
View looking SE from roof of chemical unloading shed showing access MH to EAS neutralization tank.
Foundation for - from S. end of bleach tower foundations looking SW.
Soap spill from col. line 53A looking NE.
Next lime kiln foundations from roof of existing lime kiln building hot end looking S.
S. end of "B" mill machine room from S. end looking N.
Warehouse addition from NW. corner looking SE.
Foundation for CLO2 & NaOH seal pits from Col. line 32P looking S.
Warehouse addition from roof of "A" mill machine room looking NE.
"B" mill machine room from roof of "A" mill machine room looking SE.
Trench for relocated air, water, and electrical lines between filter building and chip blower building looking SE.
MH#1E on 6" ES-36-081 looking SE.
Forming for foundation for new blending & broke tanks, from temporary walkway looking NW.
MCC 14-4 W. face N. side.
Cable tray from electrical control building to chip conveyor gallery looking SE.
Cable tray from looking E.
Cable tray from elec. control building to chip conv. gallery from top of gallery looking N.
Electrical & phone conduits to water treatment plant form SW. side of chip conveyor bent looking NE.
Walkway support at top of stairs S. wall of "A" mill Power Group floor E1. 1932.5 looking NW.
"B" mill machine room from NW. corner looking SE.