"B" Mill recovery Bldg. lifting 1st economizer tube bundles (top) to correct elevator. Looking West.
"B" Mill digester. Kamyr/Horton vertomatic welder.
E.W. Corridor between power and recaust showing 24" EMUC and 10"GF looking S.W.
E.W. Corridor between power and recaust showing 24" EMUC and 10"GF looking S.E.
"B" Mill Pulping Group inner skin cladding S. wall N.S. road looking N.
"B" Mill Digester area-inner skin cladding S. wall N.S. road looking N.E.
Woods Division - Fire.
"B" Mill Digester. Kamyr/Horton vertomatic welder.
Excavation E.W. corridor power-recaust 4"ES, 24" EMC-36-061 MH3B, Gas 10"GF West.
Excavation E.W. corridor power-recaust 4"ES, 24" EMC-36-061 MH3B, Gas 10"GF MH.
Excavation for two 3" ULD manholes. Central N.S. road looking S.
"B" Mill Recaust #5 Weak Wash Tank Metal jacket completed by J. Drexel. Central N.W. road looking E.
"A" Mill Recaust Tie-in Liquor Inlet Line Modification by DWG CJ-735-413.
"B" Mill Recovery B. remodifying tank #13-#14 manway hole for personnel access Nor.
"B" Mill Recovery B. Steam drum looking North.
"B" Mill Recovery B. Steam drum looking N.E.
"B" Mill Turbo-Generator inner skin cladding N.S. central rd. looking E.
Woods Division - Fire.
"B" Mill Excavation 23"ULD 36-240 and 241, 12" EA 36-009 central N.S. rd. looking S.E.
"B" Mill Digester area - Brownstock Filtrate Tank Rebar - looking N.E.
"B" Mill Pulping Group east elevation looking W.
Excavation E.W. corridor MH3B, IF, 10" GF, 24" EMC 36-061 4" FS 36-083 2 valves on 6" WFP 36-130, 1 gas riser on 6" GF 36-207, 8" GF 36-206.
Excavation E.W. corridor MH3B, IF, 10" GF MH, 24" EMC 36-061 4" ES 36-083 2 valves on 6" WFP 36-130, 1 gas riser on 6" GF 36-207 and gas riser on 8" GF 36-207 looking S.E.
Excavation E.S. corridor 24" EMC 26-061 MH5B looking N.E.
"B" Mill Turbo-Generator inner skin cladding N.S. central rd. looking N.
"B" Mill Machine Room couch pit repulper insert.
"B" Mill Machine Room looking inside S. side of reactor pit.
"B" Mill Machine Room, south side of wire silo showing position of fan pump suction.
Woods Division - Fire.
"B" Mill Evap. area phase I of structural steel N.S. central rd. looking S.
Fiber Salvage Sump looking N.E.
24" EMUC-36-062 outlet from Fiber Salvage Sump looking E.
Lime Kiln Control Rom addition from N.W. corner looking S.E.
Depositing over burden and silt at worked out section of gravel pit looking S.
Depositing over burden and silt at worked out section of gravel pit looking S.
Vacuum blower in Machine Room looking N.E.
Vacuum blower in Machine Room looking S.W.
Tert pit along south dyke looking N.
Water boiling up at about N. and E.
Woods Division - Fire.
Spoil area at worked out gravel pit looking S.E.
Depositing over burden and silt at worked out section of gravel pit looking S.
Lime Rock conveyor from S.E. corner looking N.W.
Lime Rock Loader Dump Hopper from W. side looking at S.E. corner.
Trench for W.F.P. Line from road near Fire Hall looking N.E.
Trailer load of stell for "B" mill Pulping Group W. side looking E.
Chip Conveyor Bent #2 from roadway looking N.E.
"B" Mill Power Group from Track #14 looking N.W.
Lagoon site from N23+30 and E 41+80 looking E.
Steel topped out "B" mill Pulping Group looking N.E.