Print preview Close

Showing 806 results

Archival description
Nechako Watershed Council fonds
Nechako Watershed Council fonds
Nechako Watershed Council (Dr. Richard Krehbiel) collection
Nechako Watershed Council (Dr. Richard Krehbiel) collection
"Water Release Facility at Kenney Dam: Alternative Concept Layout, Construction Planning and Cost" by SNC Lavalin
"Water Release Facility at Kenney Dam: Alternative Concept Layout, Construction Planning and Cost" by SNC Lavalin
Nechako Enhancement Society "Kenney Dam Cold Water Release Facility: Addendum to April 2008 Interim Report"
Nechako Enhancement Society "Kenney Dam Cold Water Release Facility: Addendum to April 2008 Interim Report"
Briefing Document for the Nechako Watershed Council re: Assessment of Options for a Water Release Facility at Kenney Dam prepared by Triton Environmental Consultants
Briefing Document for the Nechako Watershed Council re: Assessment of Options for a Water Release Facility at Kenney Dam prepared by Triton Environmental Consultants
"Backgrounder: Potential Downstream Hydrographs from Alternate Water Release Facilities at Kenney Dam" prepared by Nechako Enhancement Society
"Backgrounder: Potential Downstream Hydrographs from Alternate Water Release Facilities at Kenney Dam" prepared by Nechako Enhancement Society
"Management of Water Temperatures in the Lower Nechako: Water Release Reduction Opportunities with Kenney Dam Temperature Control" Presentation by Fisheries and Oceans Canada
"Management of Water Temperatures in the Lower Nechako: Water Release Reduction Opportunities with Kenney Dam Temperature Control" Presentation by Fisheries and Oceans Canada
"Executive Summary re: Cheslatta Lake - River System"
"Executive Summary re: Cheslatta Lake - River System"
"Proposed 2008/2009 Scope of Work: Cheslatta Fan Channel Technical Studies Detailed Design and Assessment" prepared by Northwest Hydraulic Consultants, Ltd with Mike Miles and Associated Ltd.
"Proposed 2008/2009 Scope of Work: Cheslatta Fan Channel Technical Studies Detailed Design and Assessment" prepared by Northwest Hydraulic Consultants, Ltd with Mike Miles and Associated Ltd.
Nechako Enhancement Society "Nechako River - Definition of Acceptable Flows and Temperatures Interim Progress Report" prepared by Triton Environmental Consultants, Ltd.
Nechako Enhancement Society "Nechako River - Definition of Acceptable Flows and Temperatures Interim Progress Report" prepared by Triton Environmental Consultants, Ltd.
"Kenney Dam Cold Water Release Facility Memorandum on Costs" prepared by Wilson Hydrotechnical Services
"Kenney Dam Cold Water Release Facility Memorandum on Costs" prepared by Wilson Hydrotechnical Services
"Summary of Anticipated Benefits of a Cold Water Release Facility at Kenney Dam Based on Studies to Date" prepared by the Nechako Enhancement Society
"Summary of Anticipated Benefits of a Cold Water Release Facility at Kenney Dam Based on Studies to Date" prepared by the Nechako Enhancement Society
"Cheslatta / Murray Lakes and River System: The Role of Hydraulic Flushing on Lake and Stream Primary Productivity and Ecosystem Recovery" prepared by John Stockner (Eco-Logic Ltd) and Pat Slaney (PSlaney Aquatic Science Ltd)
"Cheslatta / Murray Lakes and River System: The Role of Hydraulic Flushing on Lake and Stream Primary Productivity and Ecosystem Recovery" prepared by John Stockner (Eco-Logic Ltd) and Pat Slaney (PSlaney Aquatic Science Ltd)
"Anticipated Benefits from the Proposed Cold Water Release Facility at Kenney Dam: Draft #4" prepared by the Fraser Basin Council
"Anticipated Benefits from the Proposed Cold Water Release Facility at Kenney Dam: Draft #4" prepared by the Fraser Basin Council
"Report on Background Information Report Murray - Cheslatta River System" prepared by Golder Associates, Ltd.
"Report on Background Information Report Murray - Cheslatta River System" prepared by Golder Associates, Ltd.
Nechako Watershed Council Report: Assessment of Potential Flow Regimes for the Nechako Watershed prepared by 4Thought Solutions, Inc.
Nechako Watershed Council Report: Assessment of Potential Flow Regimes for the Nechako Watershed prepared by 4Thought Solutions, Inc.
Nechako Enhancement Society "Towards a Decision on a Release Water Temperature for a Cold Water Release Facility at Kenney Dam: Report" prepared by Triton Environmental Consultants, Ltd., and Aspen Applied Sciences, Ltd.
Nechako Enhancement Society "Towards a Decision on a Release Water Temperature for a Cold Water Release Facility at Kenney Dam: Report" prepared by Triton Environmental Consultants, Ltd., and Aspen Applied Sciences, Ltd.
"Nechako Downstream Allocation Model (N-DAM) DRAFT Simulation Results" prepared by Dan Bouillon
"Nechako Downstream Allocation Model (N-DAM) DRAFT Simulation Results" prepared by Dan Bouillon
Nechako Watershed Council Report: "Assessment of Potential Flow Regimes for the Nechako Watershed"
Nechako Watershed Council Report: "Assessment of Potential Flow Regimes for the Nechako Watershed"
"Nechako River Cold Water Release Facility Recommended Communications Plan, 2003-2005" prepared by Denis & Muntener Advertising, Ltd., and Aspen Communications Ltd.
"Nechako River Cold Water Release Facility Recommended Communications Plan, 2003-2005" prepared by Denis & Muntener Advertising, Ltd., and Aspen Communications Ltd.
Nechako Downstream Allocation Model: Review and Recommendations prepared by Adam Lewis of Ecofish
Nechako Downstream Allocation Model: Review and Recommendations prepared by Adam Lewis of Ecofish
"Falls River Water Use Plan" prepared by the BC Hydro Project Team and the Falls River Water Use Plan Consultative Committee
"Falls River Water Use Plan" prepared by the BC Hydro Project Team and the Falls River Water Use Plan Consultative Committee
"Nechako Downstream Allocation Model (N-DAM) DRAFT Simulation Results"
"Nechako Downstream Allocation Model (N-DAM) DRAFT Simulation Results"
"Activity 5: Assessment of Benefits. Framework for Assessing the Benefits of the Proposed Nechako River Cold Water Release Facility" prepared by Robinson Consulting and Associates, Ltd.
"Activity 5: Assessment of Benefits. Framework for Assessing the Benefits of the Proposed Nechako River Cold Water Release Facility" prepared by Robinson Consulting and Associates, Ltd.
Nechako Cold Water Release Facility Year 1 Pre-Engineering and Environmental Studies - Nechako Canyon and Cheslatta Fan prepared by Environmental Dynamics Inc.
Nechako Cold Water Release Facility Year 1 Pre-Engineering and Environmental Studies - Nechako Canyon and Cheslatta Fan prepared by Environmental Dynamics Inc.
Nechako River Cold Water Release Facility Bibliography prepared by Environmental Dynamics, Inc.
Nechako River Cold Water Release Facility Bibliography prepared by Environmental Dynamics, Inc.
"Cold Water Release Facility Communication Activities Summary" prepared by Denis & Muntener Advertising, Ltd., and Aspen Communications Ltd.
"Cold Water Release Facility Communication Activities Summary" prepared by Denis & Muntener Advertising, Ltd., and Aspen Communications Ltd.
Nechako Enhancement Society - "Kenney Dam Cold Water Release Facility Interim Report, 2002-2007"
Nechako Enhancement Society - "Kenney Dam Cold Water Release Facility Interim Report, 2002-2007"
Nechako River Cold Water Release Facility Baseline Research Report, 2002-2003 prepared by Denis & Muntener Advertising, Ltd., and Aspen Communications Ltd.
Nechako River Cold Water Release Facility Baseline Research Report, 2002-2003 prepared by Denis & Muntener Advertising, Ltd., and Aspen Communications Ltd.
Nechako Watershed Council Cold Water Release Facility Work Plan Development
Nechako Watershed Council Cold Water Release Facility Work Plan Development
Nechako Watershed Council - Executive Summary: Work Completed Towards a Water Release Facility at Kenney Dam, 2001-2009
Nechako Watershed Council - Executive Summary: Work Completed Towards a Water Release Facility at Kenney Dam, 2001-2009
Nechako Watershed Council - Evaluation of Benefits of a Water Release Facility at Kenney Dam, Correspondence and Proposals, 2001-2002
Nechako Watershed Council - Evaluation of Benefits of a Water Release Facility at Kenney Dam, Correspondence and Proposals, 2001-2002
Workshop on Instream Flow Assessment in the Water Use Planning Process: Summary Report
Workshop on Instream Flow Assessment in the Water Use Planning Process: Summary Report
Nechako Watershed Council Cold Water Release Facility Work Plan Development
Nechako Watershed Council Cold Water Release Facility Work Plan Development
"Water Release Facility at Kenney Dam: Updated Conceptual Layout and Cost Estimate" prepared by Klohn Crippen
"Water Release Facility at Kenney Dam: Updated Conceptual Layout and Cost Estimate" prepared by Klohn Crippen
Water Release Facility at Kenney Dam - Correspondence, Presentations and Reports
Water Release Facility at Kenney Dam - Correspondence, Presentations and Reports
Skins Lake Spillway Maintenance Project
Skins Lake Spillway Maintenance Project
"Power Generation at Kenney Dam" presented by Columbia Power Corporation
"Power Generation at Kenney Dam" presented by Columbia Power Corporation
Nechako Watershed Council: Flow Regime Correspondence, Presentations and Reports, 1998-2001
Nechako Watershed Council: Flow Regime Correspondence, Presentations and Reports, 1998-2001
Nechako Watershed Council: Water Licensing on the Nechako River, 1998-2000
Nechako Watershed Council: Water Licensing on the Nechako River, 1998-2000
"Cold Water Release Facility Workshops" presentations by Alcan, Triton, Klohn Crippen Integ.
"Cold Water Release Facility Workshops" presentations by Alcan, Triton, Klohn Crippen Integ.
Nechako Watershed Council Correspondence re: Flow Management Agreement, 1997-2001
Nechako Watershed Council Correspondence re: Flow Management Agreement, 1997-2001
"Transferable Water Permits: Two Case Studies of the Issues" prepared by Mike Kearney and Jim Sinner
"Transferable Water Permits: Two Case Studies of the Issues" prepared by Mike Kearney and Jim Sinner
"Conceptual Alternatives for a Release Facility at Kenney Dam: An Interim Report of the KDRF Working Group"
"Conceptual Alternatives for a Release Facility at Kenney Dam: An Interim Report of the KDRF Working Group"
"Review of Water Management in the Nechako River Basin: An Interim Report prepared for the Minister of Environment, Land and parks" prepared by BriMar Consultants, Ltd.
"Review of Water Management in the Nechako River Basin: An Interim Report prepared for the Minister of Environment, Land and parks" prepared by BriMar Consultants, Ltd.
Murray - Cheslatta System: Cheslatta Carrier Nation / Southside Economic Development Association Reports, Correspondence and Surveys, 1992-2001
Murray - Cheslatta System: Cheslatta Carrier Nation / Southside Economic Development Association Reports, Correspondence and Surveys, 1992-2001
Nechako Watershed Council Water Use Planning and Management Background Information
Nechako Watershed Council Water Use Planning and Management Background Information
Fraser Basin Council "2006 State of the Fraser Basin Report: Sustainability Snapshot 3"
Fraser Basin Council "2006 State of the Fraser Basin Report: Sustainability Snapshot 3"
Fraser Basin Council "2004 State of the Fraser Basin Report: Sustainability Snapshot 2"
Fraser Basin Council "2004 State of the Fraser Basin Report: Sustainability Snapshot 2"
The Fraser Basin Council Annual Report, 2001-2002
The Fraser Basin Council Annual Report, 2001-2002