Print preview Close

Showing 1310 results

Archival description
Mechanical Garage Control Time Cards
Mechanical Garage Control Time Cards
Mill Maintenance Control Time Cards
Mill Maintenance Control Time Cards
Tramline Control Time Cards
Tramline Control Time Cards
Machine Shop Control Time Cards
Machine Shop Control Time Cards
Mechanical Garage Control Time Shop
Mechanical Garage Control Time Shop
Warehouse Control Time Cards
Warehouse Control Time Cards
Miscellaneous Control Time Cards
Miscellaneous Control Time Cards
Environmental Students Control Time Cards
Environmental Students Control Time Cards
Sheet Metal Control Time Cards
Sheet Metal Control Time Cards
Miscellaneous Control Time Cards
Miscellaneous Control Time Cards
Projects Control Time Cards
Projects Control Time Cards
Mine Garage Control Time Cards
Mine Garage Control Time Cards
Surface Control Time Cards
Surface Control Time Cards
Electrical Control Time Cards
Electrical Control Time Cards
Mine Garage Control Time Cards
Mine Garage Control Time Cards
Sheet Metal Control Time Cards
Sheet Metal Control Time Cards
Mechanical Garage Control Time Cards
Mechanical Garage Control Time Cards
Warehouse Control Time Cards
Warehouse Control Time Cards
Unlabeled Time Cards
Unlabeled Time Cards
Standards for Shafts and Equipment Parts in the Mill
Standards for Shafts and Equipment Parts in the Mill
Contract Agreement to Lay Floor Slab in #1 Fibre Storage Building
Contract Agreement to Lay Floor Slab in #1 Fibre Storage Building
A. Y. Circuit Fibre Line Proposal, Project
A. Y. Circuit Fibre Line Proposal, Project
Rock Line Completion Project and Proposal
Rock Line Completion Project and Proposal
Pipes, Ducts and Prices
Pipes, Ducts and Prices
Cascade Screen Installation
Cascade Screen Installation
Proposal on Ax Circuit Changes
Proposal on Ax Circuit Changes
Ax Circuit Equipment
Ax Circuit Equipment
Earls Machine Shop Blueprint
Earls Machine Shop Blueprint
Re: Proposal to Relocate Environmental and Safety Offices
Re: Proposal to Relocate Environmental and Safety Offices
Proposed Extension to Training Building
Proposed Extension to Training Building
Control Device Layout for Bag Conveyor System
Control Device Layout for Bag Conveyor System
Serco Hinge Limp Ramp
Serco Hinge Limp Ramp
Transition Piece to Mill Building
Transition Piece to Mill Building
Canopy Over Fibre Storage Building Loading Door
Canopy Over Fibre Storage Building Loading Door
Serco Dock Ramp
Serco Dock Ramp
Specifications, Procedures and Maintenance of Tunnel, Gas, System
Specifications, Procedures and Maintenance of Tunnel, Gas, System
20Ft Spreader With Mechanical Twist Lock Hydraulic Layout
20Ft Spreader With Mechanical Twist Lock Hydraulic Layout
20Ft Spreader With Mechanical Twist Lock Hydraulic Layout
20Ft Spreader With Mechanical Twist Lock Hydraulic Layout
Re: Warehouse Container Crane
Re: Warehouse Container Crane
Air Handling in 1954 Mill
Air Handling in 1954 Mill
Rock Line Completion Project
Rock Line Completion Project
Recommendations on the Ay Cyclone
Recommendations on the Ay Cyclone
R3's, R'6's, and R7's Screens
R3's, R'6's, and R7's Screens
Fluid Beds
Fluid Beds
Installation of Bypass Bucket and Elevator
Installation of Bypass Bucket and Elevator
Install Ay Circuit
Install Ay Circuit
Ay Circuit
Ay Circuit
Ax Fibre Line Split
Ax Fibre Line Split
Estimate Vs. Actual Costs
Estimate Vs. Actual Costs
Ax Circuit Proposal
Ax Circuit Proposal