New lime kiln fndn. excavation from N. end looking S.
No. 10 DV house from E. side looking SW.
No. 2 turbo-gen. bldg. excavation from roof of caustic tower #5 looking E.
Rerouted oil lines running along W. side of existing soap skimming tank looking S.
CL2 bleach tower #10 pedestal form wash from column PD2X34P "B" mill Pulp Gr. looking SW.
Fndn. excavation at N. end of existing lime kiln bldg. from track #14 looking W.
Lime kiln precipitator fndn. looking NW.
Brown and bleach stock H.D. tank fndn. slab from SW. corner looking NE.
No 2 T.G. fndn. excavation from S. end looking N.
Reroute fuel oil lines E. side of "B" mill Power Gr. from S. end of trench looking N.
S. end of "B" mill Pulp Gr. from roof of "A" mill digester looking S.
Construction camp from roof of "A" mill digester looking SE.
Contractors temporary power panels 60A 120-240 T15.
Northwood temporary power panel 60A-600V.
"B" mill machine room from SE. corner of locker room looking NE.
S. end of "B" mill machine rm. from roof of "A" mill machine rm. looking SW.
"B" mill machine rm. from roof of "A" mill bleached H.D. tank looking N.
Four men on a stairwell in Corporate Head Office (L-R): Mike Madrigga, unidentified, W.A. Matson, unidentified.
1942 Fire engine prior to rebuilding and refinishing parked in the parking lot of a house.
Two fire crewmen using a ladder hinge to lower a patient.
Bunk within snowplow caboose (?)
Undercarriage.
Door latch.
Unidentified.
(L-R) Al MacPhearson (engineer) and Bill Hickey (1st Union President, Local 603) stand beside British Columbia Forest Products Limited No. 1 locomotive.
Log pile on a dirt road, Northwood visible in background.
Front end loader with dirt in its bucket.
Small bridge over a river.
Dump truck unloading dirt along a dirt road.
Chip truck parked in front of chip pile at Northwood.
Machine tracks in the dirt in foreground, river in midground.
Aerial perspective of Northwood's rail line and railcars
Front end loader piling up a gravel ramp for bridge support.
Building bridge supports into river.
Two men (L-R, unidentified, Steve Bates) in truck dump control room.
Mobile Bark Separator.
Pulp grader, Peter Girard, cutting pulp sheets for testing.
Wrapped and stamped kraft pulp sheets made by Northwood.
Unidentified employee using a fire extinguisher to put out an outdoor fire.
Northwood Pulp Mill control room.
Lab tester Marianne Dixon measures pulp fiber strengths using the Thwing tester.
View of new control room post mill expansion. Seated with back turned is Nells Kristenson (group operator).
Forklift moving bales in the pulp mill warehouse; PGE railcars visible in background.
Unidentified employee working on the baling line.
Danny McIntyre working on the pulp baling line.
Wrapped, tied, stacked and stenciled pulp bales at the end of the finishing line.
Group photo of baling and warehouse crew (?)next to 'A' machine layboy L-R: Unidentified, Charles Finke, Jerry Prentice, Suki Bining, Don Adair, George Stanier, Fred Doig, Albert Nagy, R. Boulay.
Pulp warehouse.
Pulp mill parking lot, featuring Canadian flag flying at the top of a flag pole.