No. 2 Rail Car Chip Dumper Tunnel excavation looking.
"B" Mill Machine Room, S. wall looking N.E.
"A" Mill Bleached Stock Spill N. of "A" Mill Hi-Density tank looking S.E.
"A" Mill Bleached Stock Spill between "A" and "B" Mill broke tanks looking S.E.
Heating registers thru W. wall "A" Mill Machine Room into "B" Mill Machine Room looking S.E.
Heating registers thru W. wall "A" Mill Machine Room into "B" Mill Machine Room looking S.E.
Woods Division - Riverboat Operations.
Heating Duct along W. wall "A" Mill Machine Room looking S.W.
"A" Mill Bleached Stock Spill near "B" Mill Machine Room Reactor Pit looking S.E.
No. 2 Rail Car Chip Dumper Tunnel excavation looking N.E.
No. 2 Rail Car Chip Dumper Tunnel excavation looking N.E.
"B" Mill Machine Room, formwork for Separator Chest base looking S.
"A" Mill Machine Room Sample Storage Room looking S.E.
"B" Mill Pulping Group, Digester Tower, N. Wall looking S.
"B" Mill Pulping Group Digester Tower W. wall looking E.
"B" Mill Pulping Group Digester cladding W. wall from N.W. road looking E.
Winter bridge from S. end looking N.W.
Woods Division - Riverboat Operations.
Loading gravel for stock pile from winter road looking N.E.
"B" Mill Pulping Group, Digester Tower, N. wall looking S.
"B" Mill Pulping Group, Digester Tower, N. wall looking S.
"B" Mill Pulping Group. Bottom shell of Digester.
"B" Mill Pulping Group. Bottom shell of Digester.
Gravel stock pile from S.E. corner looking N.W.
Gravel stock pile from W. end looking S.E.
Foundation for utility bridge tower #5 looking S.E.
"B" Mill Power Group #2 Turbo Generator building S. side looking N.
"B" Mill Pulping Group Bleach Towers #10 and #20 from Track #9 looking N.W.
Woods Division - Riverboat Operations.
"B" Mill Pulping Group. Digester erection and service hoist, N. wall looking south.
"B" Mill Machine Room floor slab pour at Bay Line 63 looking N.E.
"B" Mill Machine Room S. side of White Water Chest looking n.
"B" Mill Power Group Temporary work elevator looking N.E.
"B" Mill Power Group. Trench formwork along E. wall of "A" Mill Power Group looking N.W.
"B" Mill Power Group S. wall looking N.
Lime Kiln sections on Track #17 looking N.W.
"B" Mill Machine Room. Sample Room, looking N.W.
"B" Mill Pulping Group, Base of Digester looking N.E.
"B" Mill Power Group Economizer tube bundles looking S.E.
Woods Division - Riverboat Operations.
"B" Mill Power Group E. wall looking W.
"B" Mill Pulping Group. Base for Digester looking N.E.
"B" Mill Pulping Group. Temporary Plastic Wall on Bay Line PB looking S.W.
"B" Mill Machine Room. Section #4 of Impco Gravity Slusher.
"B" Mill Pulping Group. Base of Digester looking N.
"B" Mill Pulping Group Temporary plastic wall on B.L.34P looking N.E.
"A" Mill Machine Room roof looking S. along E. wall.
"B" Mill Pulping Group. Decker Filtrate Storage Tank from W. Wall.
Rebuilt foam tower looking S.E.
"B" Mill Pulping Group looking N.W.