West leg, North bent of chip conveyor looking S.E.
Chip dumper - looking N.
Looking along trench from camp ES #5 MH to Lift Station.
Spirogester tank, looking S.
Pulping Group excavation - looking N.
From roof of Digester - looking S.W.
30" EAS 36-003 under existing 30" EC
12" EA line from Recaust Pump House into existing 36" EA Wood Stave Line.
36" WMC-36-144 in trench looking SE.
Stockpiling pit run from SE corner of old gravel pit looking NE.
14" FRP EA line connection into MH#.
36" VMC-36-140 excavation at N63 + 45 looking NW.
Track supports over 30" EC-36-040 & 30 EM-36-060 looking NW.
36" WMC-36-140 looking SE from N63 + 75.
Looking NE from top of pit run stockpile.
Pit run & 3/4" minus stock piles looking NE. Pile driving rig for W. bridge at R.
WFP tie-in at N53 + 47 x E49 + 90 looking East.
Influent and effluent boxes for Spirogester.
30" EM-30-060 & 30" EC-36-060 at track supports for Track 9 looking North.
See drawing attached [rail cars]
See drawing attached [railroad tracks]
24" WMC-36-142 at West end - looking East.
Standing on track #14 looking W parallel to S. wall of power boiler building.
Trench for 8" WFP-36-120 from N66 + 55 looking south.
Power - recaust utility bridge - North end - looking South.
Power - kiln utility bridge - N-S run, North end looking South.
Recaust - kiln utility bridge - E-W run, West end looking East.
8" WFP-36-120 at branch connection to existing 10" WFP.
Power-pulp utility bridge - East end.
Power-pulp utility bridge - East end.
Power to soap utility bridge from North side - looking South East.
Power to soap utility bridge South side - looking Norh
Looking East from NW corner of walkway.
Looking East from SW corner of walkway.
Floor trench - Bleach plant.
6' x 60' strong acid neutralization tank Inlet end.
Spiragester and E.S. lift station from winter road looking SE.
Existing recaust on reactor platform looking N.
"B" mill Pulp Gr. from roof of #1 FWL tank looking NW.
"B" mill Pulp Gr. from roof of O.L.S. tank looking NW.
Dillinghams field offices from SE. corner of site looking NW.
Construction camp kitchen.
At til in GF2
Condition of pipe under Polykin.
8" pipe 45 degrees ell.
8" pipe straight.
8" pipe 90 degrees ell.
GF riser @ power GR. GF2.
Neutralization tank excavation.
Neutralization tank looking N.