Photograph depicts maintenance worker Dale Teague.
Photograph depicts mill carpenter Joe Hebert.
Photograph depicts screen repairman Jean-Marie Bilodeau.
Photograph depicts a Cassiar employee Melvin Taylor holding a hardhat on a desk.
Photograph depicts Phil B working underground.
Photograph depicts Gile Chartrand in the surface shop.
Photograph depicts warehouse clerks Cecile Pratt and Tracy Kellar in an office.
Photograph depicts mill foreman Eric Stump sitting at a desk.
Photograph depicts chief engineer for environment and safety Ashley Brown.
Photograph depicts underground mine superintendent Gerald Verret.
Photograph depicts engineer clerk Karen Brocklebank and underground mine captain Andre Jacob.
Photograph depicts utilities foreman Dave Tripp sitting at a desk.
Photograph depicts Cassiar employee Dennis McLeod in the underground mine.
Photograph depicts temporary warehouse clerk Dawn McGill sitting at a desk.
Photograph depicts process engineer Carl Kottmeier.
Photograph depicts Ciril Habjan, mill maintenance general foreman.
Photograph depicts Prime Minster Pierre Trudeau shaking hands with two men upon arrival in Cassiar.
Photograph depicts Prime Minster Pierre Trudeau speaking with an unknown man in a yellow hardhat while standing in a crowd by a Department of Transport airplane.
Photograph depicts three unknown RCMP constables standing in red serge uniform with four unknown young girls in dresses.
Photograph depicts Trudeau's photographer looking into the camera while standing behind the prime minister and an unknown man. All three men are wearing white hardhats.
Photograph depicts Trudeau speaking with men in hardhats with an "electrical shop" sign behind.
Photograph depicts Trudeau being shown the Cassiar mine from outside by Cassiar employees
Photograph depicts Trudeau standing outdoors with three unknown RCMP constables. Cassiar valley is in the background.
Photograph depicts Trudeau standing outdoors and speaking with an unknown man.
Photograph depicts a group of peaople gathered outside for a building dedication.
Photograph depicts a building with mountains in teh background. A man wearing a hardhat stands outside.
Photograph depicts group of eight men standing on lawn in front of building known as "House 130" or "Director's Lodge" (see item 2000.1.1.3.19.88). Left to right: Nick Gritzuk, Charles Rainforth Elliot, Jack Christian, W. Harold Connell, Plato Malezemoff (from Newmont Mining), Tam Zimmermann, Ken A. Creery, Fred Martin Connell. Daffodils and tulips planted in foreground, trees and mountains in background. Most men featured in photo are believed to be members of Cassiar's Board of Directors.
Photograph depicts group of eight men standing on lawn in front of building known as "House 130" or "Director's Lodge". Left to right: Nick Gritzuk, Charles Rainforth Elliot, W. Harold Connell, Jack Christian, Fred Martin Connell, Ken A. Creery, Plato Malezemoff (from Newmont Mining), Tam Zimmermann. Trees and mountains in background. Most men featured in photo are believed to be members of Cassiar's Board of Directors.
Photograph depicts group of young boys observing "CASSIAR ASBESTOS CORPORATION LTD" display table. Table features photos existing in this archival collection (see items 2000.1.1.3.19.10 and 2000.1.1.3.19.11). Photo speculated to have been taken at an event in Vernon, B.C. Handwritten annotation on verso of photograph: "1963".
Postcard depicts the mine and ore chute on McDame Mountain as part of Cassiar Asbestos Corporation Limited.
Postcard depicts a log house called the Christmas Tree House in Cassiar.
Photograph depicts a posterboard display entitled "Production of Asbestos."
Photograph depicts a posterboard display entitled "Asbestos Textiles and Uses."
The topographic map shows mine and campsite holdings within the proposed mine site. Asbestos deposits, the tramline and water bodies, such as Troutline Creek, are also included.
Annotations include certain lot titles being crossed out as well as as indication of missing survey information.
This blueprint depicts a cross-section layout of the recreational centre which includes a 1/4 scale drawing of a wall unit.
This blueprint depicts the general layout of the recreational centre. Top-down, side and front perspectives are used. The ground floor, second floor, outside walls and stage layouts are shown. Annotations in gold pen and pencil regarding clarification and changes to certain details are included. Numerical annotation at the bottom right hand of plan imposed new numbering system (3002/09/06).
This blueprint depicts the outside layout of the recreation centre and includes its north, south, east and west elevations. Details are included regarding the materials to be used for construction. Annotations in gold pen and pencil regarding clarification and changes to certain details are included. Numerical annotation at the bottom right hand of plan imposed new numbering system (3002/09/07).
This blueprint depicts a cross-section layout of the recreational centre which includes a 1/4 scale drawing of a wall unit. Annotations in gold pen and pencil regarding clarification and changes to certain details are included. Numerical annotation at the bottom right hand of plan imposed new numbering system (3002/09/09).
This blueprint depicts the overall framing structure of the recreational centre. Details include a cross section layout of the recreational centre with relevant framing dimensions, the locations and instructions for assembly as well as types of framing materials to be used. Annotations in gold pen and pencil regarding clarification and changes to certain details are included. Numerical annotation at the bottom right hand of plan imposed new numbering system (3002/09/10).
This blueprint depicts the gymnasium lighting layout. Also show is an isometric view of the air supply unit piping as well as a ventilating unit automatic control diagram. Included are detailed notes regarding system desriptions, its plan and layout as well as directions for the automatic control of the ventilation unit and heating systems. Annotations in gold pen and pencil regarding clarification and changes to certain details are included. Numerical annotation at the bottom right hand of plan imposed new numbering system (3002/09/12).
This blueprint shows the side profile of the proposed tramway to be built in Cassiar. It includes scale drawings of the crusher building, power house and support structures. The degree of tilt of the support structures are marked down where applicable. The side profile is divided into five sections due to the scaled height in elevation and the lack of drawing space. Annotation written along the leading edge of the blueprint reads "Proposed Tramway Riblet".
This blueprint shows the front and side profiles of the proposed jig back bucket for use in the tramway. Relevant measurements and dimensions are included as well as location placements for the track stand and traction rope.
This blueprint shows the top-down (showing the plan view) and the side view (showing elevation) of the transfer station layout. The process and operation of the jig back discharge and monocable loading are also included. Relevant measurements and dimensions are included as well as locations of the loading chute, the loading area, monocable as well as empty and loaded rope lines.
This map depicts the generalized pit layout and estimated waste extraction areas for 6290 bench for the month of November. Annotated details include numerical bench markers and waste extraction dates. The hand drawn plan consists of solid and dotted lines drawn with green, orange, red, blue and lead pencil.