Unidentified man at a control panel.
(L-R): Morris Powel (Pulp & Group Operator), seated is Floyd Blanchard (Tour foreman), and Roy Fujikawa (Pulp & Group Operator in the Pulp and Group control room prior to the mill expansion.
Unidentified man working at a control panel.
Unidentified man sitting at a desk within the control room.
Unidentified man standing at a control panel within the control room.
Unidentified man talking on the telephone within the control room.
Unidentified man standing at control panel within the control room.
Unidentified man at control panel.
Computer terminals in the new control room.
Computer terminals in the new control room.
Unidentifid employees working at terminals in the new control room.
Close-up of indicator panel.
Original pulp and group control room based upon the old pneumatic control system.
Morris Powel, Pulp & Group Operator, in the newly expanded pulp control room after it changed to DCS.
Unidentified employee standing next to computer server stations (?)
Five unidentified employees meeting in the pulp mill control room.
Control room.
Hauling logs to the wood room.
Log stacker hauling logs to the wood room.
Le Tourneau dropping logs onto the ground.
Crane lifting logs out of the river.
Close up of log being debarked in the barking machine.
Log decks - chip piles and pulp mill in background.
Le Tourneau log loader used to unload logging trucks.
Le Tourneau log loader used to unload logging trucks.
Pulp mill wood room.
Pulp mill wood room.
Unidentified dry chip dump operator.
Unidentified machinery in the wood room.
Hog surge bin.
Heavy duty machiner unloading wood chips (?)
Unidentified machinery in wood room.
Unidentified machinery in wood room.
Log deck infeed at wood room to debarker chippers.
Heavy duty machinery unloading chips (?)
Chip screens.
Conveyor belt for chips from silo.
Conveyor belt for chips from silo.
Woodroom line.
View of the pulp mill from the chip piles.
First few loads of chip at Northwood.
P.G.E. railcar filled with chips being unloaded at rail dump, pulp mill in background.
Chip piles and telephone poles, pulp mill in background.
chip silos, chip piles and roadway next to chip piles.
P.G.E. railcar filled with chips being dumped via hydraulic chip dump.
Chip truck driving past parking lot towards mill entrance.
Edworthy Enterprises chip truck entering pulp mill.
Chip truck entering pulp mill through security gate.
Chip truck driving down road next to chip piles.
Close-up of chips on chip pile.