Photograph depicts large square model of the new mill building that was built at the Cassiar plant site in 1970. Model is displayed on green material set on a platform in snowy area. Machinery modeled inside the structure is colour-coded. Mountain in background.
Photo depicts workers at construction site of Cassiar's new mill building.
Photograph depicts dump truck under power lines and tramlines on gravel road. Buckets hang on line, mountains in background.
Photograph depicts a man in work clothes and hard hat standing with hands placed on the first of many tram buckets hanging in a line. Steel beam framework of station building rises above him. Handwritten annotation on recto of photograph: "[F1?] LOADING STATION EL. 5800". Photograph was glued to cardboard backing with the annotation: "1962".
Photograph depicts the diesel-fired burners of the ore dryers. The large pipes and valves above were part of the fuel supply system fed by Cassiar's fuel tank farm which also supplied the power house generators. The dryer section of the mill received ore from the crushing plant by tramline and truck. These burners blasted the ore with hot air, and dried ore to desired moisture content before it was sent to the dry rock storage building and stored for mill use. Handwritten annotation on verso of photograph: "1961".
Item is an interview about Allie Vibert's career, her involvement with the International Federation of University Women and her activities at Queen's University, during which she pushed for the enrolment of women into the Faculty of Medicine.
Item is an excerpt from a presentation on economics and immigration that details the globalization, the future of economics and how women can play a roles in the future of technology and engineering.