"B" Mill Pulping Group, Base of Digester looking N.E.
"B" Mill Machine Room. Sample Room, looking N.W.
Lime Kiln sections on Track #17 looking N.W.
"B" Mill Power Group S. wall looking N.
"B" Mill Power Group. Trench formwork along E. wall of "A" Mill Power Group looking N.W.
"B" Mill Power Group Temporary work elevator looking N.E.
"B" Mill Machine Room S. side of White Water Chest looking n.
"B" Mill Machine Room floor slab pour at Bay Line 63 looking N.E.
"B" Mill Pulping Group. Digester erection and service hoist, N. wall looking south.
"B" Mill Pulping Group Bleach Towers #10 and #20 from Track #9 looking N.W.
"B" Mill Power Group #2 Turbo Generator building S. side looking N.
Foundation for utility bridge tower #5 looking S.E.
Gravel stock pile from W. end looking S.E.
Gravel stock pile from S.E. corner looking N.W.
"B" Mill Pulping Group. Bottom shell of Digester.
"B" Mill Pulping Group. Bottom shell of Digester.
"B" Mill Pulping Group, Digester Tower, N. wall looking S.
"B" Mill Pulping Group, Digester Tower, N. wall looking S.
Loading gravel for stock pile from winter road looking N.E.
Winter bridge from S. end looking N.W.
"B" Mill Pulping Group Digester cladding W. wall from N.W. road looking E.
"B" Mill Pulping Group Digester Tower W. wall looking E.
"B" Mill Pulping Group, Digester Tower, N. Wall looking S.
"A" Mill Machine Room Sample Storage Room looking S.E.
"B" Mill Machine Room, formwork for Separator Chest base looking S.
No. 2 Rail Car Chip Dumper Tunnel excavation looking N.E.
No. 2 Rail Car Chip Dumper Tunnel excavation looking N.E.
"A" Mill Bleached Stock Spill near "B" Mill Machine Room Reactor Pit looking S.E.
Heating Duct along W. wall "A" Mill Machine Room looking S.W.
Heating registers thru W. wall "A" Mill Machine Room into "B" Mill Machine Room looking S.E.
Heating registers thru W. wall "A" Mill Machine Room into "B" Mill Machine Room looking S.E.
"A" Mill Bleached Stock Spill between "A" and "B" Mill broke tanks looking S.E.
"A" Mill Bleached Stock Spill N. of "A" Mill Hi-Density tank looking S.E.
"B" Mill Machine Room, S. wall looking N.E.
No. 2 Rail Car Chip Dumper Tunnel excavation looking.
No. 2 Rail Car Chip Dumper abandoned blow line sections looking N.E.
"B" Mill Machine Room blowers for heating and ventilating system.
"B" Mill Machine Room. Blowers for heating and ventilating system.
No. 2 Rail Car Chip Dumper Tunnel Excavation looking S.E.
No. 2 Rail Car Chip Dumper Tunnel Excavation looking S.W.
No. 2 Rail Car Chip Dumper Tunnel Excavation looking N.W.
No. 2 Rail Car Chip Dumper Tunnel Excavation looking N.E.
No. 2 Rail Car Chip Dumper Tunnel Excavation looking N.
No. 2 Rail Car Chip Dumper Tunnel Excavation looking S.
No. 2 Rail Car Chip Dumper Tunnel Excavation looking N.
No. 2 Rail Car Chip Dumper Tunnel Excavation looking N.
"B" Mill Pulping Group. Clove Rotor Thick Stock Pumps.
"B" Mill Machine Room looking N.W.
"B" Mill Machine Room Sample Storage Room looking S.W.
"B" Mill Machine Room. Sample Storage Room looking S.W.