Lagoon site from N23+30 and E 41+80 looking E.
"B" Mill Power Group from Track #14 looking N.W.
Chip Conveyor Bent #2 from roadway looking N.E.
Trailer load of stell for "B" mill Pulping Group W. side looking E.
Trench for W.F.P. Line from road near Fire Hall looking N.E.
Lime Rock Loader Dump Hopper from W. side looking at S.E. corner.
Lime Rock conveyor from S.E. corner looking N.W.
Depositing over burden and silt at worked out section of gravel pit looking S.
Spoil area at worked out gravel pit looking S.E.
Water boiling up at about N. and E.
Tert pit along south dyke looking N.
Vacuum blower in Machine Room looking S.W.
Vacuum blower in Machine Room looking N.E.
Depositing over burden and silt at worked out section of gravel pit looking S.
Depositing over burden and silt at worked out section of gravel pit looking S.
Lime Kiln Control Rom addition from N.W. corner looking S.E.
24" EMUC-36-062 outlet from Fiber Salvage Sump looking E.
Fiber Salvage Sump looking N.E.
"B" Mill Evap. area phase I of structural steel N.S. central rd. looking S.
"B" Mill Machine Room, south side of wire silo showing position of fan pump suction.
"B" Mill Machine Room looking inside S. side of reactor pit.
"B" Mill Machine Room couch pit repulper insert.
"B" Mill Turbo-Generator inner skin cladding N.S. central rd. looking N.
Excavation E.S. corridor 24" EMC 26-061 MH5B looking N.E.
Excavation E.W. corridor MH3B, IF, 10" GF MH, 24" EMC 36-061 4" ES 36-083 2 valves on 6" WFP 36-130, 1 gas riser on 6" GF 36-207 and gas riser on 8" GF 36-207 looking S.E.
Excavation E.W. corridor MH3B, IF, 10" GF, 24" EMC 36-061 4" FS 36-083 2 valves on 6" WFP 36-130, 1 gas riser on 6" GF 36-207, 8" GF 36-206.
"B" Mill Pulping Group east elevation looking W.
"B" Mill Digester area - Brownstock Filtrate Tank Rebar - looking N.E.
"B" Mill Excavation 23"ULD 36-240 and 241, 12" EA 36-009 central N.S. rd. looking S.E.
"B" Mill Turbo-Generator inner skin cladding N.S. central rd. looking E.
"B" Mill Recovery B. Steam drum looking N.E.
"B" Mill Recovery B. Steam drum looking North.
"B" Mill Recovery B. remodifying tank #13-#14 manway hole for personnel access Nor.
"A" Mill Recaust Tie-in Liquor Inlet Line Modification by DWG CJ-735-413.
"B" Mill Recaust #5 Weak Wash Tank Metal jacket completed by J. Drexel. Central N.W. road looking E.
Excavation for two 3" ULD manholes. Central N.S. road looking S.
Excavation E.W. corridor power-recaust 4"ES, 24" EMC-36-061 MH3B, Gas 10"GF MH.
Excavation E.W. corridor power-recaust 4"ES, 24" EMC-36-061 MH3B, Gas 10"GF West.
"B" Mill Digester. Kamyr/Horton vertomatic welder.
"B" Mill Digester area-inner skin cladding S. wall N.S. road looking N.E.
"B" Mill Pulping Group inner skin cladding S. wall N.S. road looking N.
E.W. Corridor between power and recaust showing 24" EMUC and 10"GF looking S.E.
E.W. Corridor between power and recaust showing 24" EMUC and 10"GF looking S.W.
"B" Mill digester. Kamyr/Horton vertomatic welder.
"B" Mill recovery Bldg. lifting 1st economizer tube bundles (top) to correct elevator. Looking West.
"B" Mill Machine Room N-S road looking N.E.
"B" Mill Pulping Group. Kamyr welding shack located between A&B Mill partially obstructing mill access.
E.W. corridor between power and recaust showing 24"EMUC & 10"GF, looking N.E.
"B" Mill Machine Room - 3rd Press Pit steel insert for agitator B/L MXB.
"B" Mill Machine Room Couch Pit steel insert for agitator B/L MXB.