2001.26.1.3242 Pulpmill - General - Installation of upflow tube into position Item August 1996
2001.26.1.3245 Pulpmill - General - Installation of upflow tube into position Item August 1996
2001.26.1.3247 Pulpmill - General - Positioning the crane Item August 1996
2001.26.1.3256 Pulpmill - General - Construction of foundation base upflow tube for Tower 10 Item August 1996
2001.26.1.3259 Pulpmill - General - Excavation on bottom floor of chemical preparation building Item June 1996
2001.26.1.3268 Pulpmill - General - Installation of oxygen reactor tube Item August 1996
2001.26.1.3271 Pulpmill - General - Installation of oxygen reactor tube Item August 1996
2001.26.1.3272 Pulpmill - General - Installation of oxygen reactor tube Item August 1996
2001.26.1.3274 Pulpmill - General - Installation of oxygenb reactor tube onto its foundation base Item August 1996
2001.26.1.3279 Pulpmill - General - Installation of oxygen reactor tube onto its foundation base Item August 1996
2001.26.1.3282 Pulpmill - General - Installation of oxygen reactor tube onto its foundation base Item August 1996
2001.26.1.3283 Pulpmill - General - Installation of oxygen reactor tube onto its foundation base Item August 1996
2001.26.1.3285 Pulpmill - General - Installation of oxygen reactor tube onto its foundation base Item August 1996
2001.26.1.3288 Pulpmill - General - Installation of oxygen reactor tube onto its foundation base Item August 1996
2001.26.1.3293 Pulpmill - General - Installation of oxygen reactor tube onto its foundation base Item August 1996
2001.26.1.3295 Pulpmill - General - Installation of oxygen reactor tube onto its foundation base Item August 1996
2001.26.1.3296 Pulpmill - General - Installation of oxygen reactor tube onto its foundation base Item August 1996
2001.26.1.3299 Pulpmill - General - Installation of oxygen reactor tube onto its foundation base Item August 1996
2001.26.1.3300 Pulpmill - General - Site preparation for new foundation for oxygen delignification reactor tube Item August 1996
2001.26.1.3301 Pulpmill - General - Re-pulper in bleach washer Item November 1981
2001.26.1.3321 Pulpmill - General - NOSS quintenary and sextenary cleaners on the third floor of A-bleach plant Item November 1990
2001.26.1.3322 Pulpmill - General - Installation of bleach slusher decker on the third floor of A-bleach plant Item November 1990
2001.26.1.3323 Pulpmill - General - Bleach decker on the third floor of A-bleach plant Item November 1990
2001.26.1.3327 Pulpmill - General - Two primary and one secondary NOSS cleaners and slusher on the third floor of A-bleach plant Item November 1990
2001.26.1.3329 IPulpmill - General - nstallation of new slusher VAT on the third floor of A-bleach plant Item November 1990
2001.26.1.3332 Pulpmill - General - Line graph of feed capacity efficiency of ELP40 NOSS hydrocyclones Item July 1988
2001.26.1.3342 Pulpmill - General - Level control valve on second floor A-bleach plant Item July 1988
2001.26.1.3347 Pulpmill - General - High density storage towers Item
2001.26.1.3349 Pulpmill - General - Line graph of extraction flow vs. displacement efficiency for the brown stock digester Item
2001.26.1.3350 Pulpmill - General - Line graph of effect of feed consistency on dirt removal efficiency for Elast-o-Core hydrocyclone Item
2001.26.1.3351 Pulpmill - General - Troubleshooting table Item
2001.26.1.3353 Pulpmill - General - Capacity curves for NOSS and Elast-o-Cone hrydrocyclones Item
2001.26.1.3354 Pulpmill - General - Dirt removal efficienty curves for NOSS and Elast-o-Cone hrydrocyclones Item
2001.26.1.3355 Pulpmill - General - Dirt removal efficienty curves for NOSS and Elast-o-Cone hrydrocyclones Item
2001.26.1.3360 Pulpmill - General - Dirt removal efficiency curve for Bauer hydrocyclone Item
2001.26.1.3364 Pulpmill - General - Hand rendered schematic of process flow diagram for cleaning system Item
2001.26.1.3374 Pulpmill - General - Internal view of high shear mixer Item
2001.26.1.3377 Pulpmill - General - Bottom floor of A-Bleach plant Item October 1994
2001.26.1.3379 Pulpmill - General - Chemical railcar hauling sodium chlorate (?) Item December 1985
2001.26.1.3383 Pulpmill - General - Bottom floor chemical preparations area featuring caustic mixing tee Item October 1996
2001.26.1.3395 Pulpmill - General - Chemical unloading shed featuring restored conrete floor Item
2001.26.1.3397 Pulpmill - General - Looking down into top of chlorine dioxide absorption towers Item November 1990
2001.26.1.3402 Pulpmill - General - Top of R8 building Item February 1982
2001.26.1.3406 Pulpmill - General - Top floor of R8 building Item March 1982
2001.26.1.3409 Pulpmill - General - View of absorption tower with the saddles Item March 1982
2001.26.1.3415 Pulpmill - General - R8 generator vessel in the R8 building Item March 1982
2001.26.1.3420 Pulpmill - General - Sodium chlorate filters on the bottom floor in the R8 building Item March 1982
2001.26.1.3424 Pulpmill - General - Salt cake filter cyclone located in the R8 building Item November 1981
2001.26.1.3425 Pulpmill - General - Main electric drive to the salt cake filter located in the R8 building Item November 1981
2001.26.1.3430 Pulpmill - Expansion - Chlorine signal tank under construction for B-bleach plant Item November 1981