Unidentified employee standing next to computer server stations (?)
Morris Powel, Pulp & Group Operator, in the newly expanded pulp control room after it changed to DCS.
Computer terminals in the new control room.
Unidentified man standing at control panel within the control room.
Unidentified man standing at a control panel within the control room.
Jim Sai in control room.
Micky Smuyehuk (?) shutting down brown washers in the control room.
Tony Sakamoto at the H2S Monitor.
Seven Northwood employees seated around a meeting table.
Six Northwood employees seated around a meeting table [L-R on left side of table]: Unidentified, Ernie Poppinga, Martin Vanderstaap, Bill Minenko; [L-R on right side of table] Adrian Girard, Paul Straub.
Preparatory welding to the digester (?)
Seam welding on the recaustizing tanks.
Carpenter crew cutting forms for top section of pulper.
Reinforceing steel crew on area 2 of pulper.
Forming base for tanks onlower floor of recovery building.
Close-up of reinforcing steel crew on top of pulper and digester.
Preparing land for construction of bio-basin.
Aerial of land cleared for Northwood construction.
Exterior shot of Northwood corporat office in winter.
Northwood Pulp Mill Road in winter.
Northwood Pulp Mill Road in winter.
Hill side off of Northwood Pulp Mill Road in winter.
Stand of trees at the side of Northwood Pulp Mill Road in winter.
Northwood corporate office in winter.
Hydraulic crane lowering washer into place.
Two welders working on washer installation.
Hydraulic crane lowering washer into place.
Washer line up in "B" bleach plant which started up 2 Dec. 1982.
Washer line.
Lime kiln precipitator fndn. from track #14 looking SW.
"B" mill Power Gr. from NE. corner looking SW.
S. end of bleach towers from SE. corner of "B" mill pulping group looking NW.
Knot dump at S. end of "A" mill Pulping Group looking NW.
Forming up W.W. chest looking NE.
Overflow from filter N. end of temporary walkway to "A" mill mach. rm. looking N.
No. 2 T.G. fndn. excavation from roof of #50 caustic tower looking E.
Tracks #17 and #18 from roof of "A' mill machine room looking N.
"B" mill Pulping Group from roof of "A" mill Pulping Group lookins SW.
New lime kiln feed end fndn. looking NW.
Tie-in at N. end of 10" WFP-36-127 looking NE.
No. 2 T.G. fndn. from top of #50 caustic tower looking E.
"B" mill machine room from roof of "A" mill machine roof looking SW.
"B" mill Power Group from staircase on E. wall of "A" mill Power Group looking SE.
Wooden walkway at utility bridge tower looking NE.
New lime kiln feed end fndns. from track #14 looking NW.
24" EM-36-062 tie-in to M.H. #86 looking NW.