Close-up of indicator panel.
Unidentifid employees working at terminals in the new control room.
Computer terminals in the new control room.
Computer terminals in the new control room.
Unidentified man at control panel.
Unidentified man standing at control panel within the control room.
Unidentified man talking on the telephone within the control room.
Unidentified man standing at a control panel within the control room.
Unidentified man sitting at a desk within the control room.
Unidentified man working at a control panel.
(L-R): Morris Powel (Pulp & Group Operator), seated is Floyd Blanchard (Tour foreman), and Roy Fujikawa (Pulp & Group Operator in the Pulp and Group control room prior to the mill expansion.
Unidentified man at a control panel.
Jim Sai in control room.
Unidentified man taking notes from control panel readings.
Micky Smuyehuk (?) shutting down brown washers in the control room.
Tony Sakamoto at the H2S Monitor.
Tom Skinner and an unidentified millwrite engage in pre-shutdown discussions.
Ed Aho and Beverely (?) look at entry to chemical unloading signage which reads: "No Smoking" ; "Authorized personnel only beyond this point" ; "Eye protection area wear goggles".
Beverely (?) checking for CL2 leaks, dome valves on #2 CL2 car.
Unidentified female pulp tester tagging out #2 brown washer.
Graham Daniel, Machine Tender, at his controls in the wet end.
Ed Aho standing next to sign: "Danger: do not dip caustic cars or trains with aluminum poles an explosion may occur".
Unidentified man standing next to a number of tables labelled "shutdown in planning".
Seven Northwood employees seated around a meeting table.
Six Northwood employees seated around a meeting table [L-R on left side of table]: Unidentified, Ernie Poppinga, Martin Vanderstaap, Bill Minenko; [L-R on right side of table] Adrian Girard, Paul Straub.
Preparatory welding to the digester (?)
Seam welding on the recaustizing tanks.
Placing outside wall to shap (?) and stone build.
Carpenter crew cutting forms for top section of pulper.
Reinforceing crew on top floor of pulper.
Reinforceing steel crew on area 2 of pulper.
Setting welding work crew (?) in position on top floor of pulper building.
Forming base for tanks onlower floor of recovery building.
Reinforcing steel crew on top of pulper and digester.
Close-up of reinforcing steel crew on top of pulper and digester.
Crane lifting a steel girder into the air as two steel workers stand by.
Aerial of Security and front office under construction.
Two unidentified men reading a blueprint, mill construction in background.
Carpenter crew at work.
Preparing land for construction of bio-basin.
Preparing land for construction of bio-basin.
Bulldozer leveling land.
Aerial of land cleared for Northwood construction.
Aerial of land being cleared and debris burnt in preparation for Northwood construction.
Section of cleared land against a forest backdrop, piles of logging debris being burnt in preparation for Northwood construction.