H.A.S. field office.
Construction camp kitchen.
"B" mill MR from roof of bleached H.D. tank.
At til in GF2
Condition of pipe under Polykin.
8" pipe 45 degrees ell.
8" pipe straight.
8" pipe 90 degrees ell.
Shipping damage [to piping].
At tie in GF1
Shipping damage [to piping].
Shipping damage [to piping].
Condition of pipe under Polykin tape.
Condition of pipe under Polykin tape.
Condition of pipe under Polykin.
GF riser @ power GR. GF2.
Neutralization tank excavation.
GF riser @ power GR. GF2.
10" plug valve @ tie in GF#1.
36" x 39" WMV tie in WMC#1.
12" tie in GF#1.
6" tie in GF#3.
MR floor.
1.5" tie in GF#6.
Neutralization tank looking N.
Excavation for lime rock unloading facility looking N.
Dillinghams batch plant looking NE.
Dillinghams aggregate procuring plant at gravel pit looking N.
Machine room from roof of #2 blow tank looking North.
Pulping Gr. from roof of #2 blow tank showing new digester fndn. looking SE.
Pulping Gr. from roof of #2 blow tank.
Room roof of Bleached H.D. tank looking N.
Retaining wall at fuel oil day tank looking N.
Dry pipe valve house #10 (DPV #10) near hog conveyor tower looking NW.
Dry pipe valve house #10 (DPV #10) near hog conveyor tower looking NW.
Dry pipe valve house #10 (DPV #10).
Dry pipe valve house #10 (DPV #10).
Machine room looking N. from roof of #2 blow tank.
Pouring blow tank foundation from side of Pulping Group looking NE.
Dry pipe valve house (DPV #10).
NE. corner of Pulping Gr. looking SE. from roof of #2 blow tank.
NW. corner of Pulping Gr. looking S. from roof of #2 blow tank.
Lime kiln foundation excavation from N. end looking S.
Blending tank & broke tank foundation excavation from SW. corner looking NE.
Dry pipe valve house #10 (DPV #10).
Warehouse from N. end looking south.
Ground densification piles at N. end of Power Group from W. side looking E.
Power Group from S. end looking N.
Precipitation bldg. excavation from NW corner looking SE.
Kiln foundation excavation S. end looking N.