Mostrar 383 resultados

Archival description
134 resultados com objetos digitais Mostrar resultados com objetos digitais
Manager's Photos - Concrete for Mill Walls
2000.1.1.2.1.254 · Item · May 1952
Parte de Cassiar Asbestos Corporation Ltd. fonds

Photograph depicts 5 men working on mill construction in foreground. Dump truck, equipment, tool shed, group of men, trees and mountain base in background. Corresponding note on accompanying photo description page: "10. Pouring concrete for mill walls. Man dumping wheelbarrow in foreground."

Manager's Photos - Concrete Pier for Drier
2000.1.1.2.1.256 · Item · May 1952
Parte de Cassiar Asbestos Corporation Ltd. fonds

Photograph depicts dog and group of men working in cluttered building project, wood planks scattered throughout, trees in background. Corresponding note on accompanying photo description page: "12. Concrete pier for feed end of drier. Wooden forms stripped. Tool shed in background."

Manager's Photos - Surveying Power House Site
2000.1.1.2.1.271 · Item · April 1952
Parte de Cassiar Asbestos Corporation Ltd. fonds

Photograph depicts snowy, cleared area bordered by dirt piles. Stakes visible in mid ground, trees and mountainside in background. Corresponding note on accompanying photo description page: "3. Survey stakes on power house site. Snow piles in background."

Manager's Photos - Tent Campsite, West View
2000.1.1.2.1.273 · Item · April 1952
Parte de Cassiar Asbestos Corporation Ltd. fonds

Photograph depicts man near two buildings under construction, building supplies on ground. Tree branch in foreground; finished buildings, trees, and mountain in background. Corresponding note on accompanying photo description page: "5. Tent campsite. Looking west."

Manager's Photos - Service Garage Walls
2000.1.1.2.1.280 · Item · April 1952
Parte de Cassiar Asbestos Corporation Ltd. fonds

Photograph depicts group of men working in construction area among saw horses. Snow and lumber pile cross foreground. Visible in background: dump truck, white tent building, stand of trees, unidentified machinery speculated to be concrete mixer. Corresponding note on accompanying photo description page: "1. Building forms for concrete walls - Service Garage. This building is to be used temporarily as a machine shop."

Manager's Photos - Service Garage Walls
2000.1.1.2.1.281 · Item · April 1952
Parte de Cassiar Asbestos Corporation Ltd. fonds

Photograph depicts two men working near concrete mixer and wood frames for walls. Snow and lumber in foreground; two buildings (one white tent building), stand of trees, and mountain in background. Corresponding note on accompanying photo description page: "2. Pouring concrete for foundation walls - Service [garage]."

Manager's Photos - Tent Covered Building
2000.1.1.2.1.302 · Item · [ca. April 1952]
Parte de Cassiar Asbestos Corporation Ltd. fonds

Photograph depicts small wood building, with two windows and a door, draped with canvas. Snow pile to left of building, road in foreground, trees and mountains in background. See also item 2000.1.1.2.303. This building appears different from those at tent campsite described in item 2000.1.1.2.284.

Manager's Photos - Storage Shelter
2000.1.1.2.1.304 · Item · [ca. April 1952]
Parte de Cassiar Asbestos Corporation Ltd. fonds

Photograph depicts large structure with slanted roof sheltering unidentified material on ground. Cylinder tank stands vertically behind shelter, unidentified machinery in front. Snow-covered area in foreground, trees and mountainside in background.

Construction Album - New Mill
2000.1.1.2.05 · Dossiê/Processo · March - December 1970
Parte de Cassiar Asbestos Corporation Ltd. fonds

File contains photographs documenting the construction of Cassiar's new mill building. Photos depict early excavation, foundations, framework, construction of all seven stories, sheeting, siding, and roof tarring. Also included are photos depicting the large model of the mill, as well as construction work done on the tramline. Photos taken inside the mill depict flooring work, and milling machinery including feed chutes, screens, fans, wheelabrators, control panels, electrical panels, conveyor systems, vacuum systems, and the fan-driven air system that transported the fiber. Many photos depict construction workers, building supplies, worksites, and equipment including cranes, bulldozers, tractors, hauling trucks and trailer flatbeds. Some photos depict aerial views from the new mill and feature the plantsite, tramline, mine road, mountains, and valley.

Community Album - Post Office
2000.1.1.3.19.146 · Item · [ca. 1980]
Parte de Cassiar Asbestos Corporation Ltd. fonds

Photograph depicts unidentified men and women in front of yellow building with the signs "POST OFFCE / BUREAU DE POST / CASSIAR, B.C.", "NO PARKING". Three cars (one with siren on top) can be seen in foreground; forest in background.

Directors at Main Office, Cassiar BC
2000.1.1.4.3.07 · Item · 1961
Parte de Cassiar Asbestos Corporation Ltd. fonds

Photograph depicts group of eight men standing on front steps of Cassiar's Main Office building. Top, left to right: Ken A. Creery, John Drybrough. Middle, left to right: John E. Kennedy, Tam Zimmermann. Bottom, left to right: Fred Martin Connell, George Washington Smith, W. Harold Connell, Charles Rainforth Elliot. Windows and doors to office in background, flowers in bottom right foreground. Photo believed to have been taken on the same day as items 2000.1.1.4.3.4 - 2000.1.1.4.3.6.

Directors at House 130
2000.1.1.4.3.09 · Item · [ca. 1960]
Parte de Cassiar Asbestos Corporation Ltd. fonds

Photograph depicts group of nine men standing on lawn in front of building known as "House 130" or "Director's Lodge". Left to right: Andre Beguin, unknown, Charles Rainforth Elliot, Jack Christian, W. Harold Connell, Plato Malezemoff (from Newmont Mining), Tam Zimmermann, Ken A. Creery, Fred Martin Connell. Daffodils and tulips planted in foreground, trees and mountains in background. Most men featured in photo are believed to be members of Cassiar's Board of Directors; Beguin was a General Superintendent.

Cassiar Recreational Centre Framing Details
2000.1.2.2.5 · Item · June 1959
Parte de Cassiar Asbestos Corporation Ltd. fonds

This blueprint depicts the overall framing structure of the recreational centre. Details include a cross section layout of the recreational centre with relevant framing dimensions, the locations and instructions for assembly as well as types of framing materials to be used.

Cassiar Recreational Centre Blueprints with Annotations
2000.1.2.3 · Dossiê/Processo · June 1959
Parte de Cassiar Asbestos Corporation Ltd. fonds

Blueprint of the Cassiar Recreational Centre depicting various details regarding aspects of the building. Perspectives included within the blueprint are top-down as well as cross-sections. There are notes by the architect towards how certain building aspects and details are to be found and built throughout the blueprint. There are annotations located throughout the blueprints written in gold pen and pencil regarding certain errors, changes and further clarification on various aspects of the building from the original plans. Numerical annotation at the bottom right hand of plan imposed new numbering system (3002/09/06 to 12 repectively).

2000.1.2.3.3 · Item · June 1959
Parte de Cassiar Asbestos Corporation Ltd. fonds

This blueprint depicts the detailed plans for the recreational centre's entrance hall. There are details pertaining to the elevation of entrance doors, the overall plan of the entrance hall, the upper level staiwell as well as handrailing details. Annotations in gold pen and pencil regarding clarification and changes to certain details are included. Numerical annotation at the bottom right hand of plan imposed new numbering system (3002/09/08).

2000.1.2.3.6 · Item · June 1959
Parte de Cassiar Asbestos Corporation Ltd. fonds

This blueprint depicts the overall layout of the heating and ventilating units to be used for the first and second floor of the recreational centre. Details include the locations of fans, boilers, ducts and exhausts as well as typical heating connector connections and the plumbing layout. Annotations in gold pen and pencil regarding clarification and changes to certain details are included. Numerical annotation at the bottom right hand of plan imposed new numbering system (3002/09/11).

Cyprus Anvil Mine in Faro, YT
2000.1.1.1.14 · Dossiê/Processo · September 1975
Parte de Cassiar Asbestos Corporation Ltd. fonds

File contains set of images taken in Faro, Y.T. Annotation on photo envelope reads: “Visit to / CYPRUS ANVIL / FARO Y.T. / SEPT 1975 / BY DALE CARIN / R. WILSON.” Images depict the pit mine operated by Cyprus Anvil Corporation, including a grader, ore hauling truck (likely a Wabco), an explosives transport truck, and unidentified equipment including an electrical utility box and some type of rotating wheel in the mill building.

Men in Crusher Building Site, View from Above
2000.1.1.2.2.10 · Item · 1963
Parte de Cassiar Asbestos Corporation Ltd. fonds

Men working among lumber at crusher building site, various materials scattered throughout. Vertically protruding planks from framework of crusher building are in foreground. Tree-covered valley in background. Construction of a long structure near the edge of the excavation area can be seen in midground; this is speculated to be the section of the crusher building which housed conveyor "B".

Lunchroom Damaged by Boulder
2000.1.1.2.2.24 · Item · 1963
Parte de Cassiar Asbestos Corporation Ltd. fonds

Handwritten caption beside this photo reads: "Lunchroom Damaged by Boulder". Large boulder stands to right of small building, walls of right corner partially destroyed. Lumber, upturned saw horse, and various other material lie on ground. Dirt road in foreground, mountainside in background.

Barricading Against Falling Loose Rock
2000.1.1.2.2.34 · Item · 1963
Parte de Cassiar Asbestos Corporation Ltd. fonds

Three men work in area confined by barricades made of vertical metal rods and horizontal wood planks (see item 2000.1.1.2.352). Two ladders in foreground, (one being used by construction worker). Lumber and semi-finished walls can be seen at higher level of elevation in background.

Door of Completed Crusher Building
2000.1.1.2.2.48 · Item · 1963
Parte de Cassiar Asbestos Corporation Ltd. fonds

Handwritten caption beside this photo reads: "View of completed building." Large door on side of building, offering view of interior. Miscellaneous material in snowy foregrounded area: tractor equipment, steel drum, lumber etc.

Forming Footings for Retaining Wall at Crusher Site
2000.1.1.2.03.04 · Item · 4 July 1964
Parte de Cassiar Asbestos Corporation Ltd. fonds

Handwritten annotation on recto of photograph: "FORMING FOOTING RETAINING WALL JULY 4/64." Photograph depicts construction workers
standing in forms for cement laid against mountain wall on high elevation of construction site. A retaining structure made with wood planks and rebar separates mountainside dirt from cement forms. A front end loader can be seen in midground, near unidentified building. Mountain range in background.

Pouring Footing for Retaining Wall at Crusher Site
2000.1.1.2.03.03 · Item · 4 July 1964
Parte de Cassiar Asbestos Corporation Ltd. fonds

Handwritten annotation on recto of photograph: "POURING FOOTING RETAINING WALL JULY 4/64." Photograph depicts construction workers manually pouring cement into forms laid against mountain wall on high elevation of construction site. Cement is being transported by wheelbarrow. A retaining structure made with wood planks and rebar separates mountainside dirt from cement forms. A bulldozer can be seen in background, as well as a front end loader and back hoe tractor. Building at crusher site also in background.

Retaining Wall at Crusher Site
2000.1.1.2.03.06 · Item · 9 July 1964
Parte de Cassiar Asbestos Corporation Ltd. fonds

Handwritten annotation on recto of photograph: "RETAINING WALL POUR JULY 9/64." Photograph depicts large unidentified machinery in front of the retaining wall under conveyor of crusher building. Boom of crane can be seen in midground on right. Crusher building in background, dirt road in foreground.

Footing for Transformer House at Crusher Site
2000.1.1.2.03.11 · Item · 20 August 1964
Parte de Cassiar Asbestos Corporation Ltd. fonds

Handwritten annotation on recto of photograph: "FORMING FOOTING FOR TRANSFORMER HOUSE AUG 20/64." Photograph depicts construction workers standing in forms made of wood and rebar for cement footings. Lumber scattered throughout, mountain range in background.

Model for New Mill Displayed Outdoors
2000.1.1.2.04.03 · Item · [ca. 1970]
Parte de Cassiar Asbestos Corporation Ltd. fonds

Photograph depicts large square model of the new mill building that was built at the Cassiar plant site in 1970. Model is displayed on green material set on a platform in snowy area. Machinery modeled inside the structure is colour-coded. Mountain in background.

Townsite & Plantsite, 1958
2000.1.1.3.13.02 · Item · 1958
Parte de Cassiar Asbestos Corporation Ltd. fonds

Photograph depicts the Cassiar townsite in foreground. Mill, dry rock storage building, and tailings pile can be seen in background. Handwritten annotation on verso of photograph: "1958 [1961 crossed through]."

Townsite & Plantsite, View Facing East
2000.1.1.3.13.03 · Item · [before 1970]
Parte de Cassiar Asbestos Corporation Ltd. fonds

Photograph depicts the Cassiar plantsite in foreground, including the mill, dry rock storage building, tailings pile, and many other buildings. Townsite in midground, mountains in background. Handwritten annotation on recto of photograph: "Cassiar."