Looking SE at recaust pipe bridge.
From just West of #2 seal tank - looking South btween #1 Blow Tank & Digester Tw.
Looking NE from just South of mens locker room.
Looking North between #1 Blow Tank & Digester Tower.
Floor trench - Bleach plant.
Tank overflow - Bleach plant.
Floor trench overflow - Bleach plant.
Log pile on a dirt road, Northwood visible in background.
Front end loader with dirt in its bucket.
The Pulpmill expansion of the digester tower.
The construction of the digester tower during the expansion of the pulpmill.
Aerial of Beaver Bridge construction site.
Unidentified man walking along a dirt road.
6' x 60' strong acid neutralization tank Inlet end.
Spiragester and E.S. lift station from winter road looking SE.
Existing recaust on reactor platform looking N.
Strong acid (EAS) neutralization tank discharge end.
Natural garragulating station at construction camp looking NW.
Existing recaust bldg. west wall from col. line 32 between CA2 & CA3 looking N.
Existing recaust on reactor platform looking N.
Existing recaust on Col. CA & 32 looking W.
SW. corner of chemical unloading shed looking SE.
Existing recaust bldg. west wall between cols. CA &31 looking NW.
Existing recaust bldg. west wall between cols. CA &32 looking NW.
Existing recaust on Col. line CA between 31 & 32 looking W.
Existing recaust on Col. 30 & CB looking W.
Existing recaust on Col. CB (?) & 31 looking SW.
Existing acid effluent (EA) from seal tank #15 and Bleach plant looking SW.
Existing acid effluent (EA) from seal tank #15 and Bleach plant looking SW.
Temporary support for chip conveyor bent # looking SE.
Southwest corner of chemical unloading shed looking SE.
"B" mill Pulp Gr. from roof of #1 FWL tank looking NW.
"B" mill Pulp Gr. from roof of O.L.S. tank looking NW.
Dillinghams field offices from SE. corner of site looking NW.
Construction camp from E. end of woodroom roof looking S.
"B" mill Power Gr. from SW. corner looking NE.
Construction camp from W. end of woodroom roof looking SE.
Trench for rerouted services to admin. bldgs. from W. end looking E.
"B" mill Pulp Gr. from roof of #1 WWS tank looking NW.
"B" mill Power Gr. from SE. corner looking NW.
"B" mill machinery room from roof of blending tank looking N.
"B" mill machinery room from roof of bleached H.D. tank looking N.
Construction camp kitchen.
Retaining wall at fuel oil day tank.
New kiln location.
Dillingham pre-fab area.
Construction camp kitchen.
Temporary walkway to "A" mill.
Foundation for boiler rapid drain tank. New location.