Mostrar 806 resultados

Archival description
18 resultados com objetos digitais Mostrar resultados com objetos digitais
2003.4.4.2.10 · Dossiê/Processo · 1985-1987
Parte de Kemano Completion Project Dispute Collection

File consists of drafts and background material for Shirvell's expert report for the Nechako court action. Includes a photocopy of an article by Neilson and Banford entitled "Chinook Salmon (Oncorhynchus tshawytscha) Spawner Characteristics in Relation to Redd Physical Features"; "In Defense of the Instream Flow Incremental Methodology" by Orth and Maughan; handwritten drafts of Shirvell's expert report; handwritten notes about the subject matter in the report; hand drawn graphs; a "Synopsis of key IFIM related testimony and evidence before the Federal Energy Regulatory Commission (FERC) in the Philadelphia Electric Power Company (Conowinga Dam) Case"; "Expert Report for the Nechako River Court Action - J.H. Mundie"; drafts of Shirvell's "Review of Incremental-Type Methodology for Assessing Reduced Streamflows and its Application to Alcan's Proposed Kemano Completion Hydroelectric Development"; and a "Technical Statement for Nechako River Court Action - DFO vs. ALCAN: Habitat Modelling" by Cole Shirvell. Also includes memoranda entitled: "Nechako River Court Action: FRB Involvement" (Apr. 7, 1986), "Nechako Court Action - IFIM in Canada" (Jan. 20, 1987), "Nechako Court Action" (Sept. 22, 86), "Relevance of the 'Shirvell' Studies" (Oct. 3, 1986), "Conference with Cole Shirvell - Oct. 10, 1986 - Vancouver" (Oct. 14, 1986), "Comments on Draft DFO Position on Nechako River Fish Flow Requirements" (Mar. 17, 1986), "Expert Report for Nechako River Court Action" (Apr. 18, 1986), and "Nechako River Documents in My Control" (Jan. 24, 1986) from Shirvell to Ennis.

2003.4.4.2.06 · Dossiê/Processo · Feb. 1984
Parte de Kemano Completion Project Dispute Collection

File consists of documents relating to the editorial review of Shirvell's report, "Review of Incremental-Type Methodology for Assessing Reduced Streamflows and Its Application to Alcan's Proposed Kemano Completion Hydroelectric Development". Includes correspondence from Envirocon, comments on Shirvell's report from Robert Milhous and other colleagues, and a draft of the paper with commentary from Envirocon.

2003.4.1.46 · Dossiê/Processo · 1997
Parte de Kemano Completion Project Dispute Collection

File consists of a reprint of Mundie and Crabtree's article, "Effects on Sediments and Biota of Cleaning a Salmonid Spawning Channel". Also includes a note to Alderdice from Mundie and a humourous note regarding the article entitled "Excerpts from: Critical Reviews of 'Effects on sediments...etc."

Envirocon and Alcan
2003.4.4.3 · Subsérie · 1980-1984
Parte de Kemano Completion Project Dispute Collection

Subseries primarily consists of reports and publications created by Envirocon Limited, the environmental consultants contracted by Alcan for the Kemano Completion Project environmental assessment. Also includes records created by Envirocon, Alcan, and the Department of Fisheries and Oceans regarding joint meetings and Envirocon's scientific methodology.

Sem título
2003.4.4.3.20 · Dossiê/Processo · Jan. 1984
Parte de Kemano Completion Project Dispute Collection

File consists of an original copy of "Environmental Studies Associated with the Proposed Kemano Completion Hydroelectric Development - Volume 15: Environmental Planning and Project Design" by Envirocon prepared for Alcan. Annotated by Cole Shirvell.

2003.4.4.3.21 · Dossiê/Processo · Jan. 1984
Parte de Kemano Completion Project Dispute Collection

File consists of an original copy of "Environmental Studies Associated with the Proposed Kemano Completion Hydroelectric Development - Volume 16: Environmental Impact Assessment Methods and Criteria" by Envirocon prepared for Alcan.

2003.4.4.3.22 · Dossiê/Processo · Jan. 1984
Parte de Kemano Completion Project Dispute Collection

File consists of an original copy of "Environmental Studies Associated with the Proposed Kemano Completion Hydroelectric Development - Volume 18: Lower Nanika Assessment Area Environmental Impact Assessment" by Envirocon prepared for Alcan.

2003.4.4.3.23 · Dossiê/Processo · Jan. 1984
Parte de Kemano Completion Project Dispute Collection

File consists of an original copy of "Environmental Studies Associated with the Proposed Kemano Completion Hydroelectric Development - Volume 19: Morice-Bulkley and Skeena Assessment Areas Environmental Impact Assessment" by Envirocon prepared for Alcan.

2003.4.4.3.24 · Dossiê/Processo · Jan. 1984
Parte de Kemano Completion Project Dispute Collection

File consists of an original copy of "Environmental Studies Associated with the Proposed Kemano Completion Hydroelectric Development - Volume 21: Nechako River and Fraser Assessment Areas Environmental Impact Assessment" by Envirocon prepared for Alcan. Annotated by Cole Shirvell.

2003.4.4.3.19 · Dossiê/Processo · Jan. 1984
Parte de Kemano Completion Project Dispute Collection

File consists of an original copy of "Environmental Studies Associated with the Proposed Kemano Completion Hydroelectric Development - Volume 5: Fish Resources of the Nechako River System Baseline Information" by Envirocon prepared for Alcan. Annotated by Cole Shirvell.

1996.7.5.122 · Item · [between 1993 and 1994]
Parte de BCUC Kemano Completion Project Review Collection

Item consists of an exhibit for the British Columbia Utilities Commission's hearings on the Kemano Completion Project entitled "Letter from K. Smith of Northern Trollers Association to R.J. Pellatt of the B.C. Utilities Commission, dated November 19, 1993".

1996.7.5.124 · Item · [between 1993 and 1994]
Parte de BCUC Kemano Completion Project Review Collection

Item consists of an exhibit for the British Columbia Utilities Commission's hearings on the Kemano Completion Project entitled "Document from J.S. Peepre and Associates to Nechako and Fraser River Valleys Committee entitled "Riverfront Trails and Park System Master Plan Update: City of Prince George", dated October 1992".

1996.7.5.125 · Item · [between 1993 and 1994]
Parte de BCUC Kemano Completion Project Review Collection

Item consists of an exhibit for the British Columbia Utilities Commission's hearings on the Kemano Completion Project entitled "Letter from Pat Moss, Chair of the Rivers Defense Coalition to L.R. Barr of the B.C. Utilities Commission, dated November 18, 1993".

1996.7.5.126 · Item · [between 1993 and 1994]
Parte de BCUC Kemano Completion Project Review Collection

Item consists of an exhibit for the British Columbia Utilities Commission's hearings on the Kemano Completion Project entitled "Letter from D. Austin of Fraser & Beatty to L.R. Barr of the B.C. Utilities Commission, regarding Request for the Adjournment of the KCP Proceedings, dated November 25, 1993".