"B" Mill Machine Room couch pit repulper insert.
"B" Mill Machine Room looking inside S. side of reactor pit.
"B" Mill Machine Room, south side of wire silo showing position of fan pump suction.
"B" Mill Evap. area phase I of structural steel N.S. central rd. looking S.
Fiber Salvage Sump looking N.E.
24" EMUC-36-062 outlet from Fiber Salvage Sump looking E.
Lime Kiln Control Rom addition from N.W. corner looking S.E.
Depositing over burden and silt at worked out section of gravel pit looking S.
Depositing over burden and silt at worked out section of gravel pit looking S.
Vacuum blower in Machine Room looking N.E.
Vacuum blower in Machine Room looking S.W.
Tert pit along south dyke looking N.
Water boiling up at about N. and E.
Spoil area at worked out gravel pit looking S.E.
Depositing over burden and silt at worked out section of gravel pit looking S.
Lime Rock conveyor from S.E. corner looking N.W.
Lime Rock Loader Dump Hopper from W. side looking at S.E. corner.
Trench for W.F.P. Line from road near Fire Hall looking N.E.
Trailer load of stell for "B" mill Pulping Group W. side looking E.
Chip Conveyor Bent #2 from roadway looking N.E.
"B" Mill Power Group from Track #14 looking N.W.
Lagoon site from N23+30 and E 41+80 looking E.
Steel topped out "B" mill Pulping Group looking N.E.
Steel topped out "B" mill Pulping Group from locker room looking S.E. - 2:00 PM
Lagoon site from top of sand stock pile looking W.
Lagoon site from N23+30 and E41+80 looking W.
Lagoon site from N23+30 and E41+80 looking S.E.
Lagoon site from N23+30 and E41+80 looking S.E.
Looking E. down South dike from aoubt TP19.
"B" Mill machine Room from near Sub-station looking S.E.
Trench along N. side of Water Treatment Plant looking E.
Lagoon site from top of sand stock pile looking N.W.
Lagoon site from S.W. corner of existing lagoon looking E.
Water Treatment Clarifier from N. side of Water Treatment Plant looking N.
Lagoon site from top of stock pile looking N.W.
Lagoon site from top of stock pile looking W.
Lagoon site from S.W. corner of existing lagoon looking S.W.
Lagoon site from S.E. corner of existing lagoon looking S.
Lagoon site from S.W. corner of existing lagoon looking S.E.
"B" Mill Machine Room roof from roof of "A" mill Machine Room looking N.W.
"B" Mill Machine Room from roof of "A" mill Blending Tank looking N.W.
"B" Mill Pulping Group from near Woods Div. building looking S.E.
"B" Mill Power Group from N-S Roadway looking N.E.
Recaust G.L.C. building addition and #2 W.W.S. and U.W.L.S. tanks from roof of #20 Caustic Tower looking S.E.
No. 2 Turbo Generator building from roof of #20 Caustic Tower looking E.
30" EMUC-36-060 from Col. line 34P "B" mill Pulping Group looking S.
Lagoon site, organic overburden from about N24+00 and E49+50 looking S.W.
"B" mill Pulping Group from N-S roadway looking N.E.
"B" mill Machine Room from Column MXA X 71 looking S.W.
"B" mill Power Group from roof of Recaust building looking N.E.