Scenic shots from road to Mill
Looking along trench from camp ES #5 MH to Lift Station.
Pulping Group excavation - looking at N.W. corner W. of center bent.
View looking S.E. of gravel pit.
View looking S.W. of gravel pit.
Spirogester tank, looking S.
Spirogester tank, looking W. along ES trench.
Pulping Group excavation - looking N.
North bent chip conveyor - looking N.
36" WMC trench at 15" EA break.
36" WMC trench - looking S. from N63 + 75.
H.A.S. field office.
From roof of Digester - looking S.W.
30" EAS 36-003 under existing 30" EC
From Digester tower - looking S.E.
From roof of Digester - looking N.
From roof of Digester - looking N.
From roof of Digester - looking N.E.
From roof of Digester - looking E.
From top of Digester tower S. side looking down.
From roof of Digester - looking S.E.
From top of Digester tower S. side looking down.
WP & WFP & MH #1 along N 50 + 86 - looking E.
Crushing plant - looking S.
12" EA line from Recaust Pump House into existing 36" EA Wood Stave Line.
Power Group excavating after frost prot. - looking N.
36" WMC-36-144 in trench looking SE.
8" WFP-47-100 thrust block at SW corner of campsite.
24" WMC-36-142 near N59 + 00 looking NW.
36" WMC-36-140 near N63 + 75 looking NE.
35" WMC-36-140 at 24" WMC-36-141 branch to Power Group
24" WMC-36-142 near N59 + 00 looking
30" EAS-36-002 looking W from mixing tank location.
Clmap on 8" WFP-47-100 E-W run next to thrust block at SW corner of campsite.
Stockpiling pit run from SE corner of old gravel pit looking NE.
36" WMC-36-140 at S limit of contract 401.
Laying 3-1/2" GF-47-301 along E 46+79 in camp, looking N.
36" WMC-36-144 at cross connection looking SW.
36" WMC-36 & 24" WMC-36 - looking South from near Foam Tower.
Chlorination retention tank being lowered into place. Looking SE.
14" FRP EA line connection into MH#.
Pit run stockpile - looking N.
14" FRP EA line - looking North from MH #24.
Footings for track supports over 30" EC-36-040 & 30"EM-36-060 looking North.
Pit run stockpile - looking W.
14" FRP EA line - looking North from MH #24.
Drain pit #2 on 24" WMC-36-142 at N58 + 64 - looking NW.
WMC crossover connection looking SW.
WMC crossover connection - looking NE.
EAS mixing tank - location looking North.