Kraft pulp sheets made by Northwood.
Sample of brown stock discharge (?)
Aerial view of Corporate Head Office sometime in late fall or early winter.
Northwood Pulp Mill control room.
Close up of control panel.
View of trench for 8" dia. E.S. from camp at about E 31+00 Approx. 200' of trench in 3 hrs. (3:30 p.m.)
Pulp. Gp. excavation from point near SW corner existing Pulp. Gp. looking SE.
Pulp. Gp. excavation from point E. of conveyor bent #2 and N. of road look. NW.
Spoiled. [pipe laid in a ditch]
Pulp. Gp. excavation from point E. of conveyor bent #2 and N. of road look. SW.
M.R. excavation from E. end of walkway looking NW.
View from NW corner of walkway into 3" dia. W.P. excavation (machine room)
Looking E. at E. end of gravel pit. Start of removing over-burden.
View of trench for 8" dia. E.S. from camp at about E 31+00 Approx. 200' of trench in 3hrs (9:30 a.m.)
E. side Power Gp. looking SW at transformer bank and quick drain tank.
E. side Power Gp. looking SW at concrete block building (Bunker C)
Excavation for 3" dia. W.P. line from NW corner of walkway looking N.
View of excavation for M.R. - North end.
Looking N. along 3" dia. W.P. line W. of M.R. excavation.
Excavation for 3" dia. W.P. line from NW corner of walkway looking N.
Looking SW at R.R. and road crossing, 8" dia. E.S. N. of W.T. Plant.
View looking NE Pulp. Gp. excavation.
View from S. of gate on chip truck road looking S. along new camp access road.
Le Tourneau moving logs.
NW aerial survey marker looking N. along new camp access road.
Looking N. from MH#3 Camp 8" ES.
Brown stock high density tower #2.
Propane vapourizer station - East side Power Group.
Putting in thrust block form 3" WP line West of M.R.
Broken electrical cables in Power Group excavation.
Looking West down trench from 8" WFP-47-100.
Looking S.W. into Power Group excavation.
First 60' section of 42" F.R.P. EAS pipe in place.
First 60' section of 42" F.R.P. EAS pipe in place.
North chip conveyor bent support.
42" F.R.P. EAS pipe looking S. from about N 60 + 25.
West leg, North bent of chip conveyor looking S.E.
Support pile for power pole at West side of south bent of chip conveyor.
Cat hauling pedestal & footing for East leg of North bent of chip conveyor.
Looking North along 30" EAS trench from about N61 + 60.
Looking S.E. from North end of Pulping Group excavation.
M.R. backfilling - looking North.
Chip conveyor North bent looking S.E.
Chip conveyor center bent looking S.E.
Chip dumper - looking N.
Chip car unloader - looking S.S.W.
Scenic shots from road to Mill
Scenic shots from road to Mill
Chip car unloader - looking N.N.W.
Scenic shots from road to Mill