Le Tourneau moving logs.
Propane vapourizer station - East side Power Group.
Putting in thrust block form 3" WP line West of M.R.
Broken electrical cables in Power Group excavation.
Looking S.W. into Power Group excavation.
First 60' section of 42" F.R.P. EAS pipe in place.
Support pile for power pole at West side of south bent of chip conveyor.
M.R. backfilling - looking North.
Chip car unloader - looking S.S.W.
Scenic shots from road to Mill
Scenic shots from road to Mill
North bent chip conveyor - looking N.
36" WMC trench at 15" EA break.
From Digester tower - looking S.E.
From roof of Digester - looking N.
From roof of Digester - looking N.
From roof of Digester - looking N.E.
From roof of Digester - looking E.
8" WFP-47-100 thrust block at SW corner of campsite.
36" WMC-36-140 at S limit of contract 401.
Laying 3-1/2" GF-47-301 along E 46+79 in camp, looking N.
36" WMC-36-144 at cross connection looking SW.
Pit run stockpile - looking N.
14" FRP EA line - looking North from MH #24.
Drain pit #2 on 24" WMC-36-142 at N58 + 64 - looking NW.
WMC crossover connection looking SW.
Looking South from tp of pit run stockpile.
Looking West from top of pit run stockpile.
Break in WFP line near 8" WFP-47-100 tie-in at SE corner of camp looking NE.
DPV #10 house East of Power Group looking N.
GF line laid in trench looking South from pipe bridge tower.
Excavation for pump lines betwen camp ES lift station and spirogester.
Pulp. Gp. excavation from point E. of conveyor bent #2 and N. of road look. SW.
Looking E. at E. end of gravel pit. Start of removing over-burden.
View of trench for 8" dia. E.S. from camp at about E 31+00 Approx. 200' of trench in 3hrs (9:30 a.m.)
E. side Power Gp. looking SW at transformer bank and quick drain tank.
Looking SW at R.R. and road crossing, 8" dia. E.S. N. of W.T. Plant.
NW aerial survey marker looking N. along new camp access road.
Looking N. from MH#3 Camp 8" ES.
First 60' section of 42" F.R.P. EAS pipe in place.
Cat hauling pedestal & footing for East leg of North bent of chip conveyor.
Looking North along 30" EAS trench from about N61 + 60.
Chip conveyor North bent looking S.E.
Chip car unloader - looking N.N.W.
Scenic shots from road to Mill
Pulping Group excavation - looking at N.W. corner W. of center bent.
View looking S.E. of gravel pit.
Spirogester tank, looking W. along ES trench.
36" WMC trench - looking S. from N63 + 75.
H.A.S. field office.