35" WMC-36-140 at 24" WMC-36-141 branch to Power Group
36" WMC-36 & 24" WMC-36 - looking South from near Foam Tower.
Footings for track supports over 30" EC-36-040 & 30"EM-36-060 looking North.
WMC crossover connection - looking NE.
Track supports over 30" EC-36-040 & 30" EM-36-060 - looking NW.
Track 1A looking South from In-Motion-Scale.
Effluent discharge.
Gravel pit from SW corner - looking NE.
8" WFP AC pipe from existing line at SE corner of camp.
8" WFP AC pipe from existing line at SE corner of camp.
WFP tie-in at N50 + 81 x E49 + 90 looking East.
Looking NW across M.R. excavation from E. end of walkway. First day of work.
Looking NE & N across M.R. excavation from W. end of walkway. Second day of work.
M.R. excavation from E. end of walkway looking NW.
E. side Power Gp. looking SW at concrete block building (Bunker C)
Excavation for 3" dia. W.P. line from NW corner of walkway looking N.
View of excavation for M.R. - North end.
View looking NE Pulp. Gp. excavation.
Brown stock high density tower #2.
Looking West down trench from 8" WFP-47-100.
42" F.R.P. EAS pipe looking S. from about N 60 + 25.
Looking S.E. from North end of Pulping Group excavation.
Chip conveyor center bent looking S.E.
Scenic shots from road to Mill
View looking S.W. of gravel pit.
From top of Digester tower S. side looking down.
WP & WFP & MH #1 along N 50 + 86 - looking E.
Crushing plant - looking S.
24" WMC-36-142 near N59 + 00 looking
30" EAS-36-002 looking W from mixing tank location.
Clmap on 8" WFP-47-100 E-W run next to thrust block at SW corner of campsite.
Chlorination retention tank being lowered into place. Looking SE.
Pit run stockpile - looking W.
14" FRP EA line - looking North from MH #24.
EAS mixing tank - location looking North.
Blowout at or near tie-in for 8" WFP-47-100 at SE corner of camp.
Effluent discharge.
Looking down on break in WFP line near 8" WFP-47-100 tie-in at SE corner of camp looking NE.
View from H.A. Simons field office window.
Looking E. along trench for 24" WMC-36-141. 36" WMC-36-140 & 10" GF-36-120.
Northwood corporate office in winter.
Northwood corporate office in autumn.
Northwood corporate office in summer.