Bunk within snowplow caboose (?)
Undercarriage.
Door latch.
Unidentified.
Close up of unidentified snowplow detail.
Detail of snowplow door.
Top view of snowplow.
Drums of oil or fuel (?)
Detail of piping.
Detail of wood grain or electrical cordage (?)
Undercarriage.
Profile of chlorine tank rail car.
Profile of newly repainted chlorine tank rail car (?)
Profile of railway snowplow at Northwood.
Detail of unidentified section of snowplow.
Profile of snowplow caboose (?)
Profile of snowplow on track.
Profile of rail car painted yellow with the following blue lettering: "Railway Museum Prince George, B.C."
Profile of railway snowplow at Northwood.
Close up of snowplow front end.
Profile of snowplow caboose (?)
Profile of snowplow (?)
Profile of snowplow.
Profile of snowplow, pulp mill complex visible in background.
Profile of snowplow caboose (?)
Close up of lumber laying against back of Chlorine tank rail car.
Profile of railway snowplow.
Seven Northwood employees seated around a meeting table.
Six Northwood employees seated around a meeting table [L-R on left side of table]: Unidentified, Ernie Poppinga, Martin Vanderstaap, Bill Minenko; [L-R on right side of table] Adrian Girard, Paul Straub.
Unidentified man standing next to a number of tables labelled "shutdown in planning".
Micky Smuyehuk (?) shutting down brown washers in the control room.
Tony Sakamoto at the H2S Monitor.
Ed Aho and Beverely (?) look at entry to chemical unloading signage which reads: "No Smoking" ; "Authorized personnel only beyond this point" ; "Eye protection area wear goggles".
Tom Skinner and an unidentified millwrite engage in pre-shutdown discussions.
Beverely (?) checking for CL2 leaks, dome valves on #2 CL2 car.
Graham Daniel, Machine Tender, at his controls in the wet end.
Unidentified female pulp tester tagging out #2 brown washer.
Ed Aho standing next to sign: "Danger: do not dip caustic cars or trains with aluminum poles an explosion may occur".
Schematic of process: chip unloading, pulp into rail cars, chemicals generator, power plant, lime kiln, digesters.
Preparatory welding to the digester (?)
Seam welding on the recaustizing tanks.
Carpenter crew cutting forms for top section of pulper.
Reinforceing steel crew on area 2 of pulper.
Forming base for tanks onlower floor of recovery building.
Close-up of reinforcing steel crew on top of pulper and digester.
Reinforcing steel crew on top of pulper and digester.