Recaust G.L.C. Tank looking N.E.
Fiber Salvage Sump "A" Mill Machine Room looking N.E.
"B" Mill Power Group from Track #14 looking N.W.
Fiber Salvage Sump "A" Mill Machine Room looking S.
Trussed girt on W. wall of "B" Mill pulping group looking S.W.
New Lime Kiln piers from Track #14 looking N.W.
"B" Mill Pulping Group at N.W. corner looking N.E.
"B" mill Power Group from roof of Recaust building looking N.E.
Lagoon site, organic overburden from about N24+00 and E49+50 looking S.W.
No. 2 Turbo Generator building from roof of #20 Caustic Tower looking E.
"B" Mill Machine Room from roof of "A" mill Blending Tank looking N.W.
Lagoon site from S.E. corner of existing lagoon looking S.
Lagoon site from S.W. corner of existing lagoon looking S.W.
Lagoon site from top of sand stock pile looking N.W.
"B" Mill machine Room from near Sub-station looking S.E.
Lagoon site from N23+30 and E41+80 looking S.E.
Lagoon site from N23+30 and E41+80 looking S.E.
Steel topped out "B" mill Pulping Group from locker room looking S.E. - 2:00 PM
Lagoon site from N23+30 and E 41+80 looking E.
"B" Mill Power Group from Track #14 looking N.W.
Trailer load of stell for "B" mill Pulping Group W. side looking E.
Lime Rock conveyor from S.E. corner looking N.W.
Vacuum blower in Machine Room looking S.W.
Vacuum blower in Machine Room looking N.E.
Depositing over burden and silt at worked out section of gravel pit looking S.
Lagoon site from N23+34 & E41+82 looking S.
35 ton machine room crane at storage near camp looking SE.
Lagoon site from N32+34 & E41+82 looking SE.
"B" mill pulping group from near woods div. bldg. looking SE.
"B" mill machine room operations floor from roof of "A" mill blending tank looking NW.
Lagoon site from N19+00 & E46+00 looking W.
30" EMUC-36-060 and 30" EC-36-040 from S. chip conveyor bent looking N.
Temporary construction XFMR at SE corner of "A" mill power group looking NW.
"B" mill power group from track #14 looking NW.
Lagoon site from NE. corner looking SE. by E.
Lagoon site from N23+34 & E41+82 looking SE.
Lagoon site from N23+34 & E41+82 looking W.
Lagoon site from SE. corner looking N.
Lagoon site from SE. corner looking NW.
Lagoon site from SE. corner looking W.
Petrescible dump pit W. side looking E.
30" EMUC-36-060 & 30" EC-36-040 from about E35+50 looking W.
"B" mill power group from roof of salt cake unloading building looking SW.
8" WFP tie-in at N64+275 on W. side of "A" mill machine room looking SE.
"B" mill pulping group from stairs on S. side of "A" mill pulping group looking S.
Chip truck dump hopper excavation from NE. corner looking SW.
42" EAS-36-001 joint at mis-match of 0's after partial layings N. side.
Foundations for #2 turbo-generator and building from top of "A" mill digester looking NE.
New lime kiln foundations from NE. corner looking SW.
New kiln drive pier from track #14 looking NW.