Recaust G.L.C. Tank looking N.E.
Fiber Salvage Sump "A" Mill Machine Room looking N.E.
"B" Mill Power Group from Track #14 looking N.W.
Fiber Salvage Sump "A" Mill Machine Room looking S.
Trussed girt on W. wall of "B" Mill pulping group looking S.W.
New Lime Kiln piers from Track #14 looking N.W.
"B" Mill Pulping Group at N.W. corner looking N.E.
"B" mill Power Group from roof of Recaust building looking N.E.
Lagoon site, organic overburden from about N24+00 and E49+50 looking S.W.
No. 2 Turbo Generator building from roof of #20 Caustic Tower looking E.
"B" Mill Machine Room from roof of "A" mill Blending Tank looking N.W.
Lagoon site from S.E. corner of existing lagoon looking S.
Lagoon site from S.W. corner of existing lagoon looking S.W.
Lagoon site from top of sand stock pile looking N.W.
"B" Mill machine Room from near Sub-station looking S.E.
Lagoon site from N23+30 and E41+80 looking S.E.
Lagoon site from N23+30 and E41+80 looking S.E.
Steel topped out "B" mill Pulping Group from locker room looking S.E. - 2:00 PM
Lagoon site from N23+30 and E 41+80 looking E.
"B" Mill Power Group from Track #14 looking N.W.
Trailer load of stell for "B" mill Pulping Group W. side looking E.
Lime Rock conveyor from S.E. corner looking N.W.
Vacuum blower in Machine Room looking S.W.
Vacuum blower in Machine Room looking N.E.
Depositing over burden and silt at worked out section of gravel pit looking S.
Petrescible dump pit W. side looking E.
30" EMUC-36-060 & 30" EC-36-040 from about E35+50 looking W.
"B" mill power group from roof of salt cake unloading building looking SW.
8" WFP tie-in at N64+275 on W. side of "A" mill machine room looking SE.
"B" mill pulping group from stairs on S. side of "A" mill pulping group looking S.
Chip truck dump hopper excavation from NE. corner looking SW.
42" EAS-36-001 joint at mis-match of 0's after partial layings N. side.
Foundations for #2 turbo-generator and building from top of "A" mill digester looking NE.
New lime kiln foundations from NE. corner looking SW.
New kiln drive pier from track #14 looking NW.
10" WFP at crossunder of 42" EAS-36-001 at N. side of chip pile looking NW.
Foundation for black liquor storage tanks from roof of shps looking SE.
"B" mill evaporators foundation excavation and B.L. tanks foundations from roof of #1 T.G. building looking N.
"B" mill power group from SE. corner of salt cake unloading building looking SW.
M.H. 3D on 12" EMUC-36-066 looking S.
10" WFP crossunder at 42" EAS-36-001 looking SW.
Interference between chip conveyor bent leg and floor beam "B" mill pulping group building floor beam from near PA2X38P looking N.
First field joint on 42" EAS-36-001 looking SE.
Trench for 42" EAS-36-001 near Parshall Flume looking S.
Mill water line at vacuum breaker near N.
42" EAS-36-001 at N54+68.5 and E39+04 looking E.
"B" mill pulping group from roof of chemical unloading shed looking W.
8" EMUC-36-065 and 6" WMC-36-147 from near lime kiln pier #1 looking SW.
"B" mill power group from roof of existing lime kiln building looking N.
B.L. tanks from roof of engineering offices looking E.