Feed end fndn. for new lime kiln looking NW.
Water leak into trench for 6" WFP-36-126 just N. of firehall looking N.
Setting column form looking NE.
Staircase on E. wall of "A" mill recovery boiler bldg. looking SW.
"B" mill Pulping Group bleach towers from SE. corner looking NW.
"B" mill Pulping Group bleach towers from S. end looking NE.
"B" mill Pulping Group from SW. corner looking NE.
Knot dump "A" mill Pulping Group looking W.
"B" mill Pulping Group from col. PCI-32P looking NW.
"B" mill machine room from W. side looking SE.
"B" mill machine room from SW. corner looking NE.
Track #14 X. end retaining wall looking NW.
Lime rock track pit and conveyor hopper ramp from roof of 30' LMD tank looking SE.
S. end of warehouse addition looking SE.
Glulam beam for warehouse addition roof.
Fndn. ring far 42' W.W.S. tank from roof of existing 45' O.L.S. tank looking NE.
Warehouse addition roof S. end , from existing warehouse roof looking SW. (3:30 p.m.)
"B" mill machine room from roof of bleached H.D. tank looking N.
Canron's 165 ton crawler crane.
Power pole carrying O/H 15KV line to water treatment plant looking SW.
24" EMUC-36 at E. wall of "A" mill bleach plant.
Foundation excavation for soap skimmer and storage tanks from NW. corner of fuel oil day tank berm looking SW.
Compacting backfill along E. side of bleach towers from 23 NaOH tank looking SW.
Contaminated fiber & B.L. sump foundation from Col. PBI x 36P looking SW.
"A" mill knot dump from "B" mill Pulping Group Col. PxCx40P looking NE.
"B" mill machine room from roof of bleached H.D. tank looking N.
12" GF-36-202 from #2 T.G. building excavation looking NW.
Trench at NW. corner of chip blower building to retoute air, water & electrical lines, looking SE.
Looking S. along E. side of contaminated fiber and B.L. foundation, "B" mill Pulping Group.
Rerouted fuel oil lines at heater building looking SW.
Anchor for retouted fuel oil lines NE corner of "A" mill Power Group building looking SE.
Lime rock track pit from roof of chip blower house looking N.
Warehouse addition from roof of "A" mill Machine Room looking N.
Tie-in location at N. end of 8" WFP-36-125 looking SE.
"A" mill Power Group staircase on E. wall looking SW.
Warehouse addition south end looking SE.
Mill from hill on Pulp Mill Road looking NE. 35mm lens.
Mill from hill on Pulp Mill Road looking NE. 210mm lens.
24" EM-36-062 tie-in to M.H. #86 looking E.
Warehouse addition from NE. corner looking SW.
"B" mill Power Group from track #14 looking NW.
"B" mill machine room first steel W. side looking NE.
Canron's 165 ton crawler crane.
Warehouse addition installing roof deck looking SW. from floor.
Trench for 15KV 250MCM cable to water treatment plant E. end looking W.
EAS neutralization tank access manhole looking SE.
S. end of "B" mill machine room from near N. end looking SE.
Footings & pedestals for enclosure for lead end, lime rock conveyor looking SW.
Broke pit area, "B" mill machine room from roof of "A" mill machine room looking W.
"B" mill Pulping Group from roof of recaust building looking W.