Soap tanks fndn. excavation from SE. corner looking NW.
"B" mill machine rm. from roof of "A" digester looking N.
Lime rock stockpile track pit and lime kiln precipitor fndn. from roof of "A" mill digester looking SE.
S. end of "B" mill Pulping Gr. from roof of chemical unloading shed looking SW.
SW. corner of "B" mill Pulping Gr. from roof of 3rd floor Pulping Gr. looking S.
No. 2 turbo generator building excavation from roof of #50 caustic tower looking E.
N. end of "B" mill machine rm. from roof of "A" mill machine rm. looking NW.
"B" mill machine rm. broke pit from roof of "A" mill machine rm. looking W.
"B" mill Power Gr. from SE. corner of "A" mill Power Gr. building looking NE.
Hydrant riser of 10" WFP-36-127 at N55 + 85.5 and E31 + 36.
Half way plus, during 1200 cubic yards poured for brown stock and bleached H.D. tanks fndn slab S. end looking NE.
"B" mill recovery boiler precipitator foundation excavation from near track #14 looking NW.
Excavation for foundation for new liquor spill collecting tank from NE corner looking SW.
Applying insulation on existing weak B.L. tank.
Lime rock track pit from W. end looking E.
Pouring fndn for tanks along E. wall of "B" mill Pulping Gr. from S. end looking N.
Demolished retaining wall at "A" mill Pulping Gr. knot chute E. end looking NW.
S. end of "B" mill machine room from S. end looking N.
"B" mill machine room broke pit from roof of "A" mill machine room looking W.
Excavation for new B.L. tanks and "B" mill evaporator bldg. from roof of existing warehouse looking S.
Excavation at N. end of existing lime kiln bldg. looking SW.
Hydrant # at E. side of hog fuel conveyor tower looking NW.
Machine rool accident S. end of "A" mill machine room.
SE. corner of "B" mill Power Gr. from walkway at E> wall of "A" mill Power Gr. looking SE.
"B" mill Power Gr. from roof of chip silo looking N.
Trench for 12" EAS line along N. wall of "A" mill evaporators from E. end looking W.
Brown stock & bleached H.D. tanks fndn. slab reinforcing steel - 75 tons "B" mill pulping from SW. corner looking NE.
S. end of tanks from SE. corner of "B" mill Pulping Gr. looking NW.
Warehouse addition from roof of "A" mill machine rm. looking N.
"B" mill machine rm. from roof of "A" mill tank looking N.
N. end of EAS neutralization tank looking SE.
Rerouted fuel oil lines with gilsulate covering N. side of salt cake unloading looking E.
Rerouted fuel oil lines at E. side of existing fuel oil heater building looking NW.
8" WFP-36-131 branch off of 10" WFP-36-127 looking NW along trench from N85 + 86 and E32 + 12.5.
Start of 1200 cubic yards poured for brown stock and bleached H.D. tanks fndn slab N. end looking SW.
"B" mill brown stock & bleached H.D. tanks fndn. slab SW. corner looking NE.
Rapid drain tank at S. end of "A" mill Power Group looking E.
Knot dump at S. end of "A" mill Pulping Group looking NW.
Forming up W.W. chest looking NE.
Overflow from filter N. end of temporary walkway to "A" mill mach. rm. looking N.
No. 2 T.G. fndn. excavation from roof of #50 caustic tower looking E.
Tracks #17 and #18 from roof of "A' mill machine room looking N.
"B" mill Pulping Group from roof of "A" mill Pulping Group lookins SW.
New lime kiln feed end fndn. looking NW.
Tie-in at N. end of 10" WFP-36-127 looking NE.
No. 2 T.G. fndn. from top of #50 caustic tower looking E.
"B" mill machine room from roof of "A" mill machine roof looking SW.
"B" mill Power Group from staircase on E. wall of "A" mill Power Group looking SE.
Wooden walkway at utility bridge tower looking NE.
New lime kiln feed end fndns. from track #14 looking NW.