"B" Mill Pulping Group. Temporary Plastic Wall on Bay Line PB looking S.W.
"B" Mill Machine Room. Sample Room, looking N.W.
Lime Kiln sections on Track #17 looking N.W.
"B" Mill Power Group Temporary work elevator looking N.E.
"B" Mill Machine Room, formwork for Separator Chest base looking S.
No. 2 Rail Car Chip Dumper Tunnel Excavation looking N.
No. 2 Rail Car Chip Dumper Tunnel Excavation looking N.
"B" Mill Machine Room. Sample Storage Room looking S.W.
"B" Mill Pulping Group. ClO2 Plan, ClO2 Generator.
Break in 2" 0 potable water line from Water Treatment Plant to Batch Plant.
No. 2 Turbo-Generator building framing from S.W. corner looking N.E.
No. 2 Rail Car Chip Dumper tunnel excavation looking N.E.
Water Treatment Clarifier looking S.E.
"B" Mill Pulping Group Bridge Crane looking N.W.
Unloading steel for #2 Turbo-Generator building looking N.W.
"B" Mill Machine Room from near Locker Room looking N.E.
"B" Mill Pulping Group from S.W. Corner looking N.E.
"B" Mill Machine Room from W. road looking South East.
"B" Mill Power Group looking South West.
42" 0 FRP Lagoon Inlet Pipe at Splitter Box End looking S.E.
"B" Mill Pulping Group looking North West.
"B" Mill Recovery B. remodifying tank #13-#14 manway hole for personnel access Nor.
"A" Mill Recaust Tie-in Liquor Inlet Line Modification by DWG CJ-735-413.
"B" Mill Digester. Kamyr/Horton vertomatic welder.
"B" Mill Digester area-inner skin cladding S. wall N.S. road looking N.E.
"B" Mill Pulping Group inner skin cladding S. wall N.S. road looking N.
E.W. Corridor between power and recaust showing 24" EMUC and 10"GF looking S.W.
South Elevation of Brown Stock building structural steel looking North.
"B" Mill Power Group Construction elevator looking S.
Winter Bridge from S. end looking N.E.
"B" Mill Pulping Group temporary Digester Tower hoist house looking N.W.
Temporary paint shed E. of Quonset warehouse looking N.E.
"B" Mill Machine Room looking S.E.
Recaust - Steam Heating System for Lime Rock Conveyor Hopper looking N.E.
"B" Mill Pulping Group looking N.W.
"B" Mill Pulping Group. Decker Filtrate Storage Tank from W. Wall.
"B" Mill Pulping Group Temporary plastic wall on B.L.34P looking N.E.
"B" Mill Pulping Group. Base for Digester looking N.E.
"B" Mill Power Group E. wall looking W.
"B" Mill Power Group S. wall looking N.
"B" Mill Machine Room floor slab pour at Bay Line 63 looking N.E.
Gravel stock pile from S.E. corner looking N.W.
Winter bridge from S. end looking N.W.
"B" Mill Pulping Group Digester Tower W. wall looking E.
"B" Mill Pulping Group, Digester Tower, N. Wall looking S.
"A" Mill Machine Room Sample Storage Room looking S.E.
"A" Mill Bleached Stock Spill between "A" and "B" Mill broke tanks looking S.E.
"B" Mill Machine Room. Blowers for heating and ventilating system.
No. 2 Rail Car Chip Dumper Tunnel Excavation looking S.E.
No. 2 Rail Car Chip Dumper Tunnel Excavation looking S.W.