12" GF-36-202 from #2 T.G. building excavation looking NW.
Trench at NW. corner of chip blower building to retoute air, water & electrical lines, looking SE.
Looking S. along E. side of contaminated fiber and B.L. foundation, "B" mill Pulping Group.
Rerouted fuel oil lines at heater building looking SW.
Anchor for retouted fuel oil lines NE corner of "A" mill Power Group building looking SE.
Lime rock track pit from roof of chip blower house looking N.
Warehouse addition from roof of "A" mill Machine Room looking N.
Tie-in location at N. end of 8" WFP-36-125 looking SE.
"A" mill Power Group staircase on E. wall looking SW.
Warehouse addition south end looking SE.
Mill from hill on Pulp Mill Road looking NE. 35mm lens.
Mill from hill on Pulp Mill Road looking NE. 210mm lens.
24" EM-36-062 tie-in to M.H. #86 looking E.
Warehouse addition from NE. corner looking SW.
"B" mill Power Group from track #14 looking NW.
"B" mill machine room first steel W. side looking NE.
Canron's 165 ton crawler crane.
Warehouse addition installing roof deck looking SW. from floor.
Trench for 15KV 250MCM cable to water treatment plant E. end looking W.
EAS neutralization tank access manhole looking SE.
S. end of "B" mill machine room from near N. end looking SE.
Footings & pedestals for enclosure for lead end, lime rock conveyor looking SW.
Broke pit area, "B" mill machine room from roof of "A" mill machine room looking W.
"B" mill Pulping Group from roof of recaust building looking W.
CLO2 & NaOH seal pit foundation at PBI-32P looking W.
Looking N. along track #18 pit in new warehouse from roof on "A" mill machine room.
"B" mill broke chest from roof of "A" mill machine room looking SW.
NW. corner of "B" mill Pulping Gr. from roof of #2 blow tank looking S.
Pipe culvert under soap track # at N. end of soap shed looking E.
Foundation excavation for 42' tank from S. side looking N.
Formwork for new capacitor room from top of grade wall at MXE-56 looking NW.
Looking NE. along column line MXA from E. side of NW chest fndn.
S. end of new warehouse looking E. from N. end of "B" mill machine room.
N. end of new warehouse looking NE. from N. end of "B" mill machine room.
Excavating for #2 turbo generator bldg. looking N.
New lime kiln fndn. excavation from N. end looking S.
No. 10 DV house from E. side looking SW.
No. 2 turbo-gen. bldg. excavation from roof of caustic tower #5 looking E.
Rerouted oil lines running along W. side of existing soap skimming tank looking S.
CL2 bleach tower #10 pedestal form wash from column PD2X34P "B" mill Pulp Gr. looking SW.
Fndn. excavation at N. end of existing lime kiln bldg. from track #14 looking W.
Lime kiln precipitator fndn. looking NW.
Brown and bleach stock H.D. tank fndn. slab from SW. corner looking NE.
No 2 T.G. fndn. excavation from S. end looking N.
Reroute fuel oil lines E. side of "B" mill Power Gr. from S. end of trench looking N.
S. end of "B" mill Pulp Gr. from roof of "A" mill digester looking S.
Construction camp from roof of "A" mill digester looking SE.
Contractors temporary power panels 60A 120-240 T15.
Northwood temporary power panel 60A-600V.
"B" mill machine room from SE. corner of locker room looking NE.