Lagoon site from SE. corner looking NW.
Lagoon site from SE. corner looking W.
Warehouse addition roof from "A" mill machine room roof looking NW.
Excavation for black liquor storage tanks looking SE.
Warehouse addition W. wall from N. end looking S.
Tracks #17 & #18 from N. wall of warehouse addition looking N.
M.H. 2D and 12" EMUC-36-066 from in front of pump house looking E.
Recaust building addition from roof of chemical unloading shed looking SE.
Warehouse addition from NW. corner looking SE.
Utility bridge tower T1 foundations excavation looking NE.
Utility bridge bent B2 foundation excavation looking SE.
Truck for 42" EAS-36-001 at S. limit of contract C401 looking NE.
H.A.S. field office looking NW.
H.A.S. field office A/C system looking NW.
"B" mill pulping group from roof of chemical unloading shed looking NW.
42" EAS-36-001 joint showing mis-match of 0's looking upstream.
Chip truck dump excavation from top of "A" mill digester looking S.
42" EAS-36-001 near E. mis-match of pipe & ell looking upstream.
New lime kiln foundations from track #14 looking NW.
Utility bridge bent #B7 looking NW.
No. 2 turbo-generator building from roof of recaust building looking N.
Looking S. along track #9 from about N.
8" EMUC-36-070 and 6" WMC-36-147 at N. wall of new filter building looking E.
Lime kiln building extension from NE. corner looking SW.
10" WFP crossunder at 42" EAS-36-001 at N54+79.5.
Construction workers using main gate.
10" WFP crossunder at 42" EAS-36-001 looking NE.
Utility bridge bent #B5 looking SW.
Gas riser at SE. corner of new green liquor clarifier building looking E.
Suspended slab SE. corner "B" mill mach. rm. looking N.
Suspended slab SE. corner "B" mill mach. rm. looking N.
Mill water line at trench excavation for 42" EAS-36-001 at N54+45.
Lime kiln bldg. addition from NE. corner looking SW.
"B" mill machine room from SE. corner ground level looking NW.
"B" mill pulping group from near SW. corner looking NE.
Foundation for #1 chip dumper from NE. corner looking SW.
Trench for 42" EAS-36-001 from about N. 50+00 looking S.
"B" mill machine room start of roof deck installation from near column Mx-74B looking NE.
Mired pickup at brocker P.I.V. in camp looking SE.
Broker P.I.V. under truck in camp.
30" EC-36-040 from SW corner of "B" mill pulping group looking N.
Black liquor storage tanks from roof of "A" mill bleach plant N. end looking NE.
60" chip conveyor foundation excavation on W. side of existing chip silos looking NE.
Lagoon site from N23+34 & E41+82 looking SW.
"B" mill evaporator bldg. from roof of engineering bldg. looking SE.
"B" mill power group from roof of existing kiln control room looking NE.
Lagoon site from N19+00 & E46+00 looking S.
Breaking out new concrete to install forgotten anchor bolts. No.#1 chip dumper from top of concrete wall looking NE.
Lime kiln control room addition from NE corner looking SW.
Lagoon site from NE corner looking SE. by S.