Trench for 42" EAS-36-001 from N. looking S.
"B" mill machine room from roof of "A" mill blending tank looking NW.
Looking S. down main corridor from SE. corner of warehouse roof.
Excavation for belt chip screen bldg. looking SW.
Lime rock railcar dump pit from N. corner looking S.
Construction power supply at E. side of "A" mill power group looking NW.
Brown stock screen & mix chest foundation from platform on S. side of "A" mill.
Lagoon site from N23+34 & E41+82 looking S.
35 ton machine room crane at storage near camp looking SE.
Lagoon site from N32+34 & E41+82 looking SE.
"B" mill pulping group from near woods div. bldg. looking SE.
"B" mill machine room operations floor from roof of "A" mill blending tank looking NW.
Lagoon site from N19+00 & E46+00 looking W.
30" EMUC-36-060 and 30" EC-36-040 from S. chip conveyor bent looking N.
Temporary construction XFMR at SE corner of "A" mill power group looking NW.
"B" mill power group from track #14 looking NW.
Lagoon site from NE. corner looking SE. by E.
Lagoon site from N23+34 & E41+82 looking SE.
Lagoon site from N23+34 & E41+82 looking W.
Lagoon site from SE. corner looking N.
Lagoon site from SE. corner looking NW.
Lagoon site from SE. corner looking W.
Warehouse addition roof from "A" mill machine room roof looking NW.
Excavation for black liquor storage tanks looking SE.
Warehouse addition W. wall from N. end looking S.
Tracks #17 & #18 from N. wall of warehouse addition looking N.
M.H. 2D and 12" EMUC-36-066 from in front of pump house looking E.
Recaust building addition from roof of chemical unloading shed looking SE.
Warehouse addition from NW. corner looking SE.
Utility bridge tower T1 foundations excavation looking NE.
Utility bridge bent B2 foundation excavation looking SE.
Truck for 42" EAS-36-001 at S. limit of contract C401 looking NE.
H.A.S. field office looking NW.
H.A.S. field office A/C system looking NW.
"B" mill pulping group from roof of chemical unloading shed looking NW.
42" EAS-36-001 joint showing mis-match of 0's looking upstream.
Chip truck dump excavation from top of "A" mill digester looking S.
42" EAS-36-001 near E. mis-match of pipe & ell looking upstream.
New lime kiln foundations from track #14 looking NW.
Utility bridge bent #B7 looking NW.
No. 2 turbo-generator building from roof of recaust building looking N.
Looking S. along track #9 from about N.
8" EMUC-36-070 and 6" WMC-36-147 at N. wall of new filter building looking E.
Lime kiln building extension from NE. corner looking SW.
10" WFP crossunder at 42" EAS-36-001 at N54+79.5.
Construction workers using main gate.
10" WFP crossunder at 42" EAS-36-001 looking NE.
Utility bridge bent #B5 looking SW.
Gas riser at SE. corner of new green liquor clarifier building looking E.
Suspended slab SE. corner "B" mill mach. rm. looking N.