An aerial view of Rustad Bros. Sawmill with the beehive burner, mill complex and log yard in the background and the lumber yard in the foreground. Photographer of this oversize photograph believed to be Bill Theessen.
An aerial view of the Northwood Corporate office, with a forested area and a road in the background, the office in the midground and the parking lot in the background. Photographer of this oversized photograph is believed to be Bill Theessen.
A helicopter attaches a pipe to the side of the digester.
A helicopter attaches a pipe to the side of the digester.
The construction of the new digester tower.
An unidentified pipe is put into place during the pulpmill expansion.
Several new buildings, such as the digester tower and the hi-density storage tanks, are constructed during the pulpmill expansion.
The new digester building under construction.
The new digester building.
The new digester building next to the old digester building.
The newly constructed chip silos.
An aerial of Northwood Pulp Mill during the expansion with the mill in the background and the parking lot in the foreground.
An aerial of Northwood Pulp Mill during the expansion with the construction occurring in the foreground.
An aerial of Northwood Pulp Mill during the expansion with the digester towers in the background and the mill complex in the foreground.
An aerial of Northwood Pulp Mill during the expansion.
The construction of the digester tower during the expansion of the pulpmill.
The Pulpmill expansion of the digester tower.
Bob Rinaldi inside the new digester building.
Dennis Matson, Member of Expansion Team and Technical Superintendent, stands beside a row of washer drums.
"B" Mill Pulping Group looking North West.
"B" Mill Pulping Group looking North East.
Roof of weather protection enclosure for welding up digester sec.
42" 0 FRP Lagoon Inlet Pipe at Splitter Box End looking S.E.
"B" Mill Pulping Group from Track #14 looking North West.
Lime Kiln Section looking South East.
Lime Kiln Piers from N. end looking South West.
"B" Mill Machine Room from near Locker Room looking North East.
Capacitor room from N.E. corner looking South West.
Soap Skimming and Storage Tanks from F.O. Day Tank dyke looking S.W.
"B" Mill Power Group looking South West.
Weather protection cover for welding digester sections.
"B" Mill Pulping Group from near Woods Div. Bldg. looking South E.
"B" Mill Machine Room from W. road looking South East.
"B" Mill Pulping Group from track #9 looking N.W.
Roof beams for "B" Mill Pulping Group looking N.W.
"B" Mill Pulping Group from N-S road looking N.E.
"B" Mill Pulping Group from S.W. Corner looking N.E.
"B" Mill Machine Room from near Locker Room looking N.E.
"B" Mill Machine Room from N.W. Corner looking S.E.
"B" Mill Machine Room from N-S road looking N.E.
Lime Kiln Piers from track #14 looking N.W.
Unloading steel for #2 Turbo-Generator building looking N.W.
"B" Mill Machine Room low bay lighting looking S.
"B" Mill Machine Room Ballast Bank looking W.
"B" Mill Machine Room Ballast Bank looking W.
Contractors parking lot looking N.
"B" Mill Power Group from track #14 looking N.
Excavation at #2 Rail Car Chip Dumper looking S.E.
"B" Mill Power Group looking N.W.
"B" Mill Pulping Group Bridge Crane looking N.W.