Brown and bleach stock H.D. tank fndn. slab from SW. corner looking NE.
No 2 T.G. fndn. excavation from S. end looking N.
Reroute fuel oil lines E. side of "B" mill Power Gr. from S. end of trench looking N.
S. end of "B" mill Pulp Gr. from roof of "A" mill digester looking S.
Construction camp from roof of "A" mill digester looking SE.
Contractors temporary power panels 60A 120-240 T15.
Northwood temporary power panel 60A-600V.
"B" mill machine room from SE. corner of locker room looking NE.
S. end of "B" mill machine rm. from roof of "A" mill machine rm. looking SW.
"B" mill machine rm. from roof of "A" mill bleached H.D. tank looking N.
Lime kiln precipitator fndn. from track #14 looking SW.
"B" mill Power Gr. from NE. corner looking SW.
S. end of bleach towers from SE. corner of "B" mill pulping group looking NW.
"B" mill machine room from roof of "A' mill machine room looking SW.
N. end of "B" mill machine room from roof of "A' mill machine room looking NW.
NW. corner of "B" mill Pulping Gr. from roof of #2 blow tank looking SE.
Lime kiln precipitator foundation excavation from track #14 looking W.
Lime rock rail car dump pipe from roof of chip blower bldg. looking N.
Staircase from E. side of Power Blr. bldg. at new location on S. of bldg. looking NE.
Fndn for H.D. storage tank looking NE.
Fndn excavation for tanks at S. end of recaust bldg. from near foam tower.
"B" mill Power Gr. from SE. corner looking N.
S. end of "B" mill machine room from roof of "A" mill machine room looking SW.
Formwork for bleach & brown sth. H.D. tank fndns. from SW. corner of "B" mill Pulp Gr. looking NE.
Grounding cable at column PD2X34P looking NE.
Lime rock track pit from top of lime rock pile looking NE.
Fndn. excavation for "B" mill evaporator from N. end looking S.
N. end of "B" mill Pulp Gr. from roof of "A" mill digester looking S.
400 A temporary power panel 575V.
N. end of "B" mill Pulping Gr. from roof of chemical unloading shed looking W.
NW. corner of "B" mill Pulping Gr. from roof of "A" mill looking SW.
SW. corner of "B" mill Pulping Gr. from roof of 33rd floor Pulping Gr. looking SW.
Lime kiln precipitator fndn. looking NE.
"B" mill Power Gr. from track #14 looking NW.
EAS neutralization tank from N. end looking S.
Foundation excavation black liquor tank in foreground, "B" mill evaporator bldg. in background from warehouse roof looking S.
Foundation excavation for recaust bldg. extension from roof of caustic tower #50 looking SE.
"A" mill machine room from roof of #2 blow tank looking N.
Foundation excavation for recaust bldg. extension.
Trench for rerouted bunker coil liner etc. from S. end looking N.
"B" mill recovery boiler foundations from stairs on E. wall of "A" mill, power boiler bldg. looking NE.
New lime kiln fndn. excavation from N. end looking SW.
Footing for coal MXA-53 looking SE.
Excavation for recaust bldg. extension from N. side looking S.
Excavation at N. end of old lime kiln bldg. from E. side looking W.
Lime rock conveyor from track #14 looking NW.
Demolished retaining wall at Pulping Gr. front chute W. end looking E.
Tank fndn slab along E. wall of "B" mill Pulping Gr. from S. end looking NE.
Lime kiln precipitator fndn. from SW corner looking NE.
SE. corner of "A" mill Power Gr. bldg. from SE corner of "B" mill Power Gr. looking NW.