"B" mill power group from NE. corner looking SW.
"B" mill power group from track #6 near salt cake unloading looking SW.
8" EMUC-36-065 and 6" WMC-36-147 from existing lime rock conveyor looking N.
Lime rock railcar dump pit from top of lime rock pile looking NE.
No. 2 turbo-generator bldg. from roof of recaust bldg. looking N.
"B" mill evaporators building foundations from roof of engineering offices looking SE.
View from lagoon site.
View from lagoon site.
8" EMUC-36-065 and 6" WMC-36-147 from N. end looking S.
Combustion engineering boiler sections from track #5A looking NE.
Trench for 4" ES-36- and 6" ES-36-081 from about col. line 71A "B" mill machine room looking SW.
30" EC-36-040 from SW. corner of "B" mill pulping group looking N.
Excavation for belt conveyor #3 and chip screen bldg. looking S.
No. 2 turbo-generator bldg. foundations from roof of #20 caustic tower looking E.
Lagoon site from N23+34 & E41+82 looking SE.
"B" mill machine room (?)
"B" mill Pulping Group from roof of existing lime kiln building N. 10:00 a.m.
"B" mill Pulping Group NW. corner from staircase on S. side of "A" mill Pulping Group looking SW.
Canrons 65 ton crane boom down from "B" mill Power Group looking NE.
Track #6A from N 66+75 looking N.
Excavation for - looking NW.
24" WMC-36-142 at S. wall of "B" mill Pulping Group looking E.
"B" mill Pulping Group from between 29P&30P just W. of PCI looking S.
Preparing roof bed for track #9 looking S. from N.
Breaking out concrete for pedestal for column PB-34P "B" mill Pulping Group looking SE.
Tracks 9, 9A & 9B from about N61+75 looking SW.
Opening in lime rock conveyor wall looking SE.
Lime rock track pit from roof of filter building looking SE.
"A" mill Power Group E. wall at column RF-47 from inside looking NE.
MH#1E on 6" ES-36-081 looking SE.
Forming for foundation for new blending & broke tanks, from temporary walkway looking NW.
MCC 14-4 W. face N. side.
Cable tray from electrical control building to chip conveyor gallery looking SE.
Cable tray from looking E.
Cable tray from elec. control building to chip conv. gallery from top of gallery looking N.
Electrical & phone conduits to water treatment plant form SW. side of chip conveyor bent looking NE.
Walkway support at top of stairs S. wall of "A" mill Power Group floor E1. 1932.5 looking NW.
"B" mill machine room from NW. corner looking SE.
"B" mill evaporator excavation from roof of "A" mill machine room looking E.
Track #4A from chip dump hopper looking N.
Excavation for M.H. 1D looking N.
Track #9A from N56+80 looking N.
Leak in 36" EAW line at N61+75 looking N.
"B" mill Power Group from roof of existing lime kiln building looking N.
New lime kiln foundations from track #14 looking NW.
"B" mill machine room from roof of existing blending tank looking N.
"B" mill machine room from roof of "A" mill machine room looking SW.
No. 2 turbo generator foundations from roof of caustic tower #20 looking NE.
Rerouted bunker "C" oil lines along W. side of "A" mill power group looking S.
Looking SW. along new alignment & embankment for track #14.