"B" Mill Power Group looking S.W.
Brown Stock spill at N.E. corner "A" Mill Bleach Plant looking W.
Black Liquor Tanks from roof of Warehouse looking S.E.
No. 2 Turbo-Generator building foundations from top of Caustic #20 Tower looking N.E.
"B" Mill Pulping Group from roof of Chemical Unloading Shed looking W.
"B" Mill Pulping Group from roof of Chemical Unloading Shed looking S.W.
Lagoon site from N23+00 and E41+80 looking E.
Lagoon site from N23+00 and E41+80 looking S.
Lagoon site from N23+00 and E41+80 looking W.
Lime Rock Conveyor looking N.W.
"13" Mill Power Group from between Tracks #5A & #5B looking S.W.
"B" Mill Machine Room from roof of "A" Mill Machine Room looking S.W.
"B" Mill Machine Room from roof of "A" Mill Machine Room looking N.W.
"B" Mill Machine Room from roof of "A" Mill Hi-Density Tank looking N.
"B" Mill Pulping Group from roof of "A" Mill Pulping Group looking W.
"B" Mill Pulping Group from roof of Chemical Unloading Shed looking W.
Lagoon from Wier Box looking North.
Lagoon site from MCC location looking S.W. by W.
Lagoon site from MCC location looking West.
Defective weld on Bleach Washer Inlet Vat.
Lagoon from S.E. corner looking N.
Lagoon rip-rap on S. Dyke from S.E. Corner looking S.E.
Lagoon site from MCC location looking S.E. by E.
Lagoon rip rap on S. Dyke looking S.E.
Lagoon Wier Box from S. ridge looking N.W.
"42" FRP Lagoon inlet pipe at splitter box end looking N.E.
No. 2 Turbo-Generator foundation looking S.W.
"B" Mill Evaporator building foundation looking N.E.
Lagoon site from N.E. corner looking south.
Recaust G.L.C. Tank looking N.E.
Fiber Salvage Sump "A" Mill Machine Room looking N.E.
"B" Mill Power Group from Track #14 looking N.W.
Fiber Salvage Sump "A" Mill Machine Room looking S.
Trussed girt on W. wall of "B" Mill pulping group looking S.W.
New Lime Kiln piers from Track #14 looking N.W.
"B" Mill Pulping Group at N.W. corner looking N.E.
"B" mill Power Group from roof of Recaust building looking N.E.
Lagoon site, organic overburden from about N24+00 and E49+50 looking S.W.
No. 2 Turbo Generator building from roof of #20 Caustic Tower looking E.
"B" Mill Machine Room from roof of "A" mill Blending Tank looking N.W.
Lagoon site from S.E. corner of existing lagoon looking S.
Lagoon site from S.W. corner of existing lagoon looking S.W.
Lagoon site from top of sand stock pile looking N.W.
"B" Mill machine Room from near Sub-station looking S.E.
Lagoon site from N23+30 and E41+80 looking S.E.
Lagoon site from N23+30 and E41+80 looking S.E.
Steel topped out "B" mill Pulping Group from locker room looking S.E. - 2:00 PM
Lagoon site from N23+30 and E 41+80 looking E.
"B" Mill Power Group from Track #14 looking N.W.
Trailer load of stell for "B" mill Pulping Group W. side looking E.