Chip Conveyor Bent #2 from roadway looking N.E.
Depositing over burden and silt at worked out section of gravel pit looking S.
Depositing over burden and silt at worked out section of gravel pit looking S.
Lime Kiln Control Rom addition from N.W. corner looking S.E.
"B" Mill Evaporator Building foundations from roof of engineering building looking S.E.
Recaust area between Lime Kiln central Bldg. and Grits dump looking S.W.
MF#213 on 30" EMUC - 36-060 looking N.E.
Tert. set up on 8" WFP at N55+75 and E35+40 looking N.W.
Lime Kiln Control Room addition from E. side looking W.
Foundations for Soap Skimming and Soap Storage Tanks from W. side berm around Fuel Oil Day Tank looking S.W.
"B" Mill Machine Room from top of "A" Mill Hi-Density Tank looking.
W.W.S. and U.W.L.S. Tanks from roof of Chemical Unloading Shed looking S.E.
"B" Mill Pulping Group looking N.E.
Lagoon site from N23+00 and E41+80 looking S.W.
Water Treatment Clarifier from E. Side looking S.W.
"B" Mill Power Group from under Hog Conveyor gallery looking N.W.
Lime Kiln Control Room addition from W. wall of "A" Mill Power Group looking S.
Lime Kiln Control Room addition from S. wall of "A" Mill Power Group looking S.E.
"B" Mill Machine Room from roof of "A" Mill Hi-Density Tank looking N.
"B" Mill Pulping Group from roof of Chemical Unloading Shed looking S.W.
N. wall of "B" mill Machine Room from N.W. corner looking S.E.
Defective weld on Bleach Washer Inlet Vat.
Lagoon from Wier Box looking South East.
Placing rip-rap on dyke near S.W. corner of Lagoon looking N.W.
Defective weld on Bleach Washer Inlet Vat.
Lagoon site from MCC location looking E.
Lagoon inlet pipe from N2+00 and E48+75 looking S.E.
Lagoon from S.E. corner looking W.
Lagoon 36" 0 FRP outlet pipe from discharge end looking E.
Lagoon Site from N.E. corner looking W.
"42" 0 FRP Lagoon inlet pipe at showing gap in pipe looking S.W.
"B" Mill Pulping Group W. wall cladding looking N.E.
"B" Mill Machine Room Bridge Crane from S.E. corner looking N.W.
Temporary cable bridge to #2 Chip Rail Car Dumper looking S.E.
"B" Mill Pulping Group from #1 Chip Dumper looking N.E.
Lagoon S. end of culvert under lagoon outlet pipe looking N.W.
Wall on W. side of existing Black Liquor Tanks looking N.E.
Chip Screen Building excavation and foundations S. end looking W.
Recaust W.W.S. pukps aisle area foundations from W. side of 42 swing tank foundation looking N.W.
36" WMC-36-149 and 24"EMUC-36-073 risers inside W. wall of "B" Mill Evaporator Building looking S.W.
Under ground pipes at S.W. corner of Chip Surge Bin building looking N.E.
42"EAS-36-001 just W. of Water Treatment Plant looking S.W.
Deaerator and feedwatr tanks from S. roof of "A" mill Power Group looking E.
Recaust G.L.C. building addition and #2 W.W.S. and U.W.L.S. tanks from roof of #20 Caustic Tower looking S.E.
Lagoon site from S.W. corner of existing lagoon looking S.E.
Lagoon site from S.W. corner of existing lagoon looking E.
Lagoon site from top of sand stock pile looking W.
Trench for W.F.P. Line from road near Fire Hall looking N.E.
Lime Rock Loader Dump Hopper from W. side looking at S.E. corner.
10EA - 36-007 from N. end of trench looking S.W.