Backfilled trench for 24" EMUC-36-062 in "A" mill bleach plant looking W.
6" WFP relocation at SE. corner of "A" mill power group looking SW.
Track #14 from SE. corner of "B" mill power group looking NE.
"B" pulping group from NW. corner looking SE.
Canrons 165 ton crawler crane.
42" EAS-36-001 joint showing mis-match of 0's at 38+90 looking upstream.
42" EAS-36-001 joint showing mis-match of 0's after partial layings S. side.
View of new bridge approach from top of "A" mill digester looking E.
Foundations for clean fiber salvage tank at SE. corner of "B" mill pulping group looking N.
New kiln drive pier from SW. corner looking NE.
Inside warehouse addition, NE. corner looking SE.
Warehouse addition from NW. corner looking SE.
Draining pump discharge line pump from mill bleach plant W.W. chest looking SE.
42" EAS-36-001 near N54+80 looking NE.
Suspended slab SE. corner "B" mill mach. rm. looking N.
Finished field joint on 42" EAS-36-001 at N55+09 looking SE.
"B" mill power group from NE. corner looking SW.
"B" mill power group from track #6 near salt cake unloading looking SW.
8" EMUC-36-065 and 6" WMC-36-147 from existing lime rock conveyor looking N.
Lime rock railcar dump pit from top of lime rock pile looking NE.
No. 2 turbo-generator bldg. from roof of recaust bldg. looking N.
30-EA-36-002 from S. side of trench looking N.W.
Broken out concrete on #1 chip dump looking S.W.
Foundation for #2 Chip Dumper from W. end looking E.
"B" Mill Machine Room roof, N. end, from roof of "A" mill Machine Room looking N.W.
"B" Mill Machine Room roof from roof of "A" Mill Machine Room looking N.W.
Recaust Green Liquor Clarifier building addition from top of Caustic #20 tower looking S.E.
8" VEN-36-280 FRP line looking N.E.
No. 2 Turbo Generator building from top of Caustic Tower #20 looking E.
W.W.S. and W.L.S. Tanks from roof of Chemical Unloading Shed looking S.E.
W.wall of "B" mill Machine Room from N.W. corner looking S.E.
Tert pit at Lagoon site S. side looking N. along E40+00.
"B" Mill Power Group from Track #14 looking N.W.
Defective weld on Bleach Washer Inlet Vat.
Lagoon site from MCC location looking S.
Defective weld on Bleach Washer Inlet Vat.
42" 0 FRP Lagoon inlet pipe from looking S.
Lagoon Site from N.E. corner looking S.W.
"B" Mill Pulping Group from Col. line 32P looking N.
"B" Mill Pulping Group from near Woods Division Building looking S.E.
B.L. Tanks from in front of Maintenance Shops looking S.E.
Capacitator and X fmr Rooms "B" mill Machine Room looking S.E.
Temporary cable bridge to #2 Chip Rail Car Dumper looking N.W.
Chip Screen building foundations from S.W. corner lookng N.E.
Trussed girt on W. wall of "B" Mill Pulping Group bracing connection looking W.
Lagoon weir box base slab looking N.W.
Unloading digester shell plates near chip silos looking S.E.
Trussed girt on W. wall of "B" Mill pulping group bracing connection looking West.
Chip Screen Building excavation and foundations N. looking W.
Trench at E. side of H.A.S. Field Office looking S.W.