Breaking out concrete for pedestal for column PB-34P "B" mill Pulping Group looking SE.
Tracks 9, 9A & 9B from about N61+75 looking SW.
Opening in lime rock conveyor wall looking SE.
Lime rock track pit from roof of filter building looking SE.
"A" mill Power Group E. wall at column RF-47 from inside looking NE.
MH#1E on 6" ES-36-081 looking SE.
Forming for foundation for new blending & broke tanks, from temporary walkway looking NW.
MCC 14-4 W. face N. side.
Cable tray from electrical control building to chip conveyor gallery looking SE.
Cable tray from looking E.
Cable tray from elec. control building to chip conv. gallery from top of gallery looking N.
Electrical & phone conduits to water treatment plant form SW. side of chip conveyor bent looking NE.
Walkway support at top of stairs S. wall of "A" mill Power Group floor E1. 1932.5 looking NW.
"B" mill machine room from NW. corner looking SE.
"B" mill evaporator excavation from roof of "A" mill machine room looking E.
Track #4A from chip dump hopper looking N.
Excavation for M.H. 1D looking N.
Track #9A from N56+80 looking N.
Leak in 36" EAW line at N61+75 looking N.
"B" mill Power Group from roof of existing lime kiln building looking N.
New lime kiln foundations from track #14 looking NW.
"B" mill machine room from roof of existing blending tank looking N.
"B" mill machine room from roof of "A" mill machine room looking SW.
No. 2 turbo generator foundations from roof of caustic tower #20 looking NE.
Rerouted bunker "C" oil lines along W. side of "A" mill power group looking S.
Looking SW. along new alignment & embankment for track #14.
Ring foundation for 30" LMS> tank and trench for 12" EMC-36-066 & 8" EMUC-36-065 from top of 45 OLS. tank looking NE.
Warehouse addition from near hydrant #4 looking SE.
"B" mill Pulping Group from roof of filter building looking N.
"A" mill Power Group E. wall at column RF-47 ;pplomg NW.
Track #5B from N66+20 looking N.
"B" mill machine room from NW. corner looking SE.
"B" mill Pulping Group S. end from roof of chemical unloading shed looking SW. (8:02 a.m.)
"B" mill Power Group from roof of existing lime kiln building looking NE. (8:18 a.m.)
"B" mill machine room from N.W. corner looking SE.
Warehouse addition from NW. corner looking SE.
Lime rock conveyor hopper ramp W. end looking SE.
Lime rock conveyor hopper ramp W. end looking NE.
MCC 16-1 and MCC 14-5 S. side.
MCC 16-1 and MCC 14-5 N. side.
Electrical & phone conduits to water treatment plant from SW. side of chip conveyor bent looking NE.
MCC 14-4 W. face S. side.
MCC 14-4 E. face S. side.
"B" mill Pulping Group SE. corner looking NW.
First steel "B" mill Power Group from hog conveyor tower looking NW.
S. end of soap loading track looking NE.
"B" mill machine room from roof of existing "A" mill blending tank looking NW.
New lime kiln foundations from track #14 looking NW.
Excavation at E55+50 for 24" WMC-36-142, 30" EMUC-36-060, 30" EC-36-040 looking NE.
Repairing leak in 36" EAW line at N61+75 looking N.