"B" mill machine room from roof of "A" mill machine room looking SW.
No. 2 turbo generator foundations from roof of caustic tower #20 looking NE.
Rerouted bunker "C" oil lines along W. side of "A" mill power group looking S.
Looking SW. along new alignment & embankment for track #14.
Ring foundation for 30" LMS> tank and trench for 12" EMC-36-066 & 8" EMUC-36-065 from top of 45 OLS. tank looking NE.
Warehouse addition from near hydrant #4 looking SE.
"B" mill Pulping Group from roof of filter building looking N.
"A" mill Power Group E. wall at column RF-47 ;pplomg NW.
Track #5B from N66+20 looking N.
"B" mill machine room from NW. corner looking SE.
"B" mill Pulping Group S. end from roof of chemical unloading shed looking SW. (8:02 a.m.)
"B" mill Power Group from roof of existing lime kiln building looking NE. (8:18 a.m.)
"B" mill machine room from N.W. corner looking SE.
Warehouse addition from NW. corner looking SE.
Lime rock conveyor hopper ramp W. end looking SE.
Lime rock conveyor hopper ramp W. end looking NE.
MCC 16-1 and MCC 14-5 S. side.
MCC 16-1 and MCC 14-5 N. side.
Electrical & phone conduits to water treatment plant from SW. side of chip conveyor bent looking NE.
MCC 14-4 W. face S. side.
MCC 14-4 E. face S. side.
"B" mill Pulping Group SE. corner looking NW.
First steel "B" mill Power Group from hog conveyor tower looking NW.
S. end of soap loading track looking NE.
"B" mill machine room from roof of existing "A" mill blending tank looking NW.
New lime kiln foundations from track #14 looking NW.
Excavation at E55+50 for 24" WMC-36-142, 30" EMUC-36-060, 30" EC-36-040 looking NE.
Repairing leak in 36" EAW line at N61+75 looking N.
Relocated air, water & elec. lines between filter bldg. & chip slur.
"B" mill Pulping Group S. end from roof of chemical unloading shed looking SW.
Looking SW. along new alignment and embankment retaining wall for track #14.
Excavation for M.H.1D looking SE.
Warehouse addition roof from "A" mill machine room roof looking N.
"B" mill machine room from roof of "A" mill bleached HI. Density Tank looking N.
Excavation & foundation for utility bridge bent #B7 from roof of existing recaust bldg. looking SW.
Ring foundation for 42' No.2 WWS. and WLS. tanks from top of 45' No.1 FWL. looking NW.
"B" mill machine room from enar sub-station looking SE.
Excavation for 60" chip conveyor along W. side of chip silos looking NW.
Lime kiln foundations from top of lime rock bucket elevator looking N.
"B" mill Power Group from SE. corner of salt cake unloading building looking SW.
Trench for relocated air, water, and electrical lines between filter building and chip blower building looking NE.
Track #6A from N67+25 looking N.
Trench for rerouted air, water & electrical lines between filter building and chip blower building at W. end of lime rock ramp looking SE.
N. end of "B" mill Power Group from platform on E. wall of "A" mill Power Group looking N.
"B" mill Pulping Group N. end from roof of chemical unloading shed looking W. (8:00 a.m.)
"B" mill Power Group N. end from platform on e. wall of "A" mill Power Group looking N. (8:14 a.m.)
New lime kiln foundation S. end from roof of existing lime kiln building looking S.
Warehouse addition roof from roof of "A" mill machine room looking N.
"B" mill machine room from roof of "A" mill bleached H.D. tower looking N.
MCC 14-4 E. face N. side.