Hydraulic crane lowering washer into place.
Two welders working on washer installation.
Hydraulic crane lowering washer into place.
Washer line up in "B" bleach plant which started up 2 Dec. 1982.
Washer line.
Overview of washer line.
Two welders working on washer installation.
Hydraulic crane lowering washer into place.
Close-up of washer end.
Close-up of washer end.
Close-up of washer valves.
Washer line.
Overview of washer line.
Overview of washers.
Washer arriving on flat bed truck.
Close-up of end of washer.
Close-up of washer valves.
Overview of washer line.
Two welders working on washer installation.
Washer line.
Washer line.
Newly installed hydrogen peroxide lines, signage: "Caution hydrogen peroxide in use".
Newly installed hydrogen peroxide lines.
Four unidentified individuals standing on top or next to a pile of gravel, machinery and a trailer can be seen in the midground.
Unidentified man testing liquids in a lab.
Pulp sample being tested by a model 549 Micrometer.
Maryann Dixon (Lab Tester) looking at a sample of effluent.
Robert Galoway viewing a pulp sheet and looking for impurities.
Unidentified man testing liquids in a lab.
Pulp sample being tested by a brightness tester.
Norm Crist and Brian Harding examining a test tube sample.
Unidentified man testing liquids in a lab.
Unidentified man testing liquids in a lab.
Unidentified section of the steam recovery boiler, cascades and evaporator.
Unidentified section of the steam recovery boiler, cascades and evaporator.
Unidentified section of the steam recovery boiler, cascades and evaporator.
Unidentified section of the steam recovery boiler, cascades and evaporator.
Unidentified section of the steam recovery boiler, cascades and evaporator.
Unidentified section of the steam recovery boiler, cascades and evaporator.
Front end loader removing snow from pulp mill complex roadways.
Front end loader removing snow from pulp mill complex roadways.
Front end loader removing snow from pulp mill complex roadways as a van drives out the security gate.