"B" Mill Power Group from Track #14 looking N.W.
Fiber Salvage Sump "A" Mill Machine Room looking S.
Trussed girt on W. wall of "B" Mill pulping group looking S.W.
New Lime Kiln piers from Track #14 looking N.W.
"B" Mill Pulping Group at N.W. corner looking N.E.
"B" mill Power Group from roof of Recaust building looking N.E.
Lagoon site, organic overburden from about N24+00 and E49+50 looking S.W.
No. 2 Turbo Generator building from roof of #20 Caustic Tower looking E.
"B" Mill Machine Room from roof of "A" mill Blending Tank looking N.W.
Lagoon site from S.E. corner of existing lagoon looking S.
Lagoon site from S.W. corner of existing lagoon looking S.W.
Lagoon site from top of sand stock pile looking N.W.
"B" Mill machine Room from near Sub-station looking S.E.
Lagoon site from N23+30 and E41+80 looking S.E.
Lagoon site from N23+30 and E41+80 looking S.E.
Steel topped out "B" mill Pulping Group from locker room looking S.E. - 2:00 PM
Lagoon site from N23+30 and E 41+80 looking E.
"B" Mill Power Group from Track #14 looking N.W.
Trailer load of stell for "B" mill Pulping Group W. side looking E.
Lime Rock conveyor from S.E. corner looking N.W.
Vacuum blower in Machine Room looking S.W.
Vacuum blower in Machine Room looking N.E.
Depositing over burden and silt at worked out section of gravel pit looking S.
"B" Mill Machine Room, south side of wire silo showing position of fan pump suction.
"B" Mill Turbo-Generator inner skin cladding N.S. central rd. looking N.
Excavation E.W. corridor MH3B, IF, 10" GF MH, 24" EMC 36-061 4" ES 36-083 2 valves on 6" WFP 36-130, 1 gas riser on 6" GF 36-207 and gas riser on 8" GF 36-207 looking S.E.
"B" Mill Excavation 23"ULD 36-240 and 241, 12" EA 36-009 central N.S. rd. looking S.E.
Excavation E.W. corridor power-recaust 4"ES, 24" EMC-36-061 MH3B, Gas 10"GF MH.
Excavation E.W. corridor power-recaust 4"ES, 24" EMC-36-061 MH3B, Gas 10"GF West.
"B" Mill digester. Kamyr/Horton vertomatic welder.
E.W. corridor between power and recaust showing 24"EMUC & 10"GF, looking N.E.
"B" Mill Recovery Bldg. lifting 1st economizer tube bundles to correct elevators looking west.
Recaust - Piping between W.L.S. Tank and #3 L.M.W. Tank looking N.W.
Insulate 1/2" 0 steam trace line existing from 4" 0 mud line going to 30" 0 EAS line from "A" mill pulp. grp. looking N.W.
"B" Mill Pulping Group lifting section of Caustic Tower #20 in place looking N.
"B" Mill Pulping Group temporary digester Tower hoist block looking N.E.
"B" Mill Machine Room steel beam bracket at column MA X 56.
"B" Mill Machine Room Temporary Steam Heaters at Column MXA X 62 looking S.E.
"B" Mill Pulping Group temporary Digester Tower hoist looking N.W.
Rebuilt foam tower looking S.E.
"A" Mill Machine Room roof looking S. along E. wall.
"B" Mill Power Group. Trench formwork along E. wall of "A" Mill Power Group looking N.W.
"B" Mill Pulping Group Bleach Towers #10 and #20 from Track #9 looking N.W.
Foundation for utility bridge tower #5 looking S.E.
Gravel stock pile from W. end looking S.E.
"B" Mill Pulping Group, Digester Tower, N. wall looking S.
"B" Mill Pulping Group Digester cladding W. wall from N.W. road looking E.
No. 2 Rail Car Chip Dumper Tunnel excavation looking N.E.
"A" Mill Bleached Stock Spill near "B" Mill Machine Room Reactor Pit looking S.E.
Heating registers thru W. wall "A" Mill Machine Room into "B" Mill Machine Room looking S.E.