"B" Mill Pulping Group W. wall cladding looking N.E.
"B" Mill Machine Room Bridge Crane from S.E. corner looking N.W.
Temporary cable bridge to #2 Chip Rail Car Dumper looking S.E.
"B" Mill Pulping Group from #1 Chip Dumper looking N.E.
Lagoon S. end of culvert under lagoon outlet pipe looking N.W.
Wall on W. side of existing Black Liquor Tanks looking N.E.
Chip Screen Building excavation and foundations S. end looking W.
Recaust W.W.S. pukps aisle area foundations from W. side of 42 swing tank foundation looking N.W.
36" WMC-36-149 and 24"EMUC-36-073 risers inside W. wall of "B" Mill Evaporator Building looking S.W.
Under ground pipes at S.W. corner of Chip Surge Bin building looking N.E.
42"EAS-36-001 just W. of Water Treatment Plant looking S.W.
Deaerator and feedwatr tanks from S. roof of "A" mill Power Group looking E.
Recaust G.L.C. building addition and #2 W.W.S. and U.W.L.S. tanks from roof of #20 Caustic Tower looking S.E.
Lagoon site from S.W. corner of existing lagoon looking S.E.
Lagoon site from S.W. corner of existing lagoon looking E.
Lagoon site from top of sand stock pile looking W.
Trench for W.F.P. Line from road near Fire Hall looking N.E.
Lime Rock Loader Dump Hopper from W. side looking at S.E. corner.
10EA - 36-007 from N. end of trench looking S.W.
"B" Mill Power Group looking S.W.
Brown Stock spill at N.E. corner "A" Mill Bleach Plant looking W.
Black Liquor Tanks from roof of Warehouse looking S.E.
No. 2 Turbo-Generator building foundations from top of Caustic #20 Tower looking N.E.
"B" Mill Pulping Group from roof of Chemical Unloading Shed looking W.
"B" Mill Pulping Group from roof of Chemical Unloading Shed looking S.W.
Lagoon site from N23+00 and E41+80 looking E.
Lagoon site from N23+00 and E41+80 looking S.
Lagoon site from N23+00 and E41+80 looking W.
Lime Rock Conveyor looking N.W.
"13" Mill Power Group from between Tracks #5A & #5B looking S.W.
"B" Mill Machine Room from roof of "A" Mill Machine Room looking S.W.
"B" Mill Machine Room from roof of "A" Mill Machine Room looking N.W.
"B" Mill Machine Room from roof of "A" Mill Hi-Density Tank looking N.
"B" Mill Pulping Group from roof of "A" Mill Pulping Group looking W.
"B" Mill Pulping Group from roof of Chemical Unloading Shed looking W.
Lagoon from Wier Box looking North.
Lagoon site from MCC location looking S.W. by W.
Lagoon site from MCC location looking West.
Defective weld on Bleach Washer Inlet Vat.
Lagoon from S.E. corner looking N.
Lagoon rip-rap on S. Dyke from S.E. Corner looking S.E.
Lagoon site from MCC location looking S.E. by E.
Lagoon rip rap on S. Dyke looking S.E.
Lagoon Wier Box from S. ridge looking N.W.
"42" FRP Lagoon inlet pipe at splitter box end looking N.E.
No. 2 Turbo-Generator foundation looking S.W.
"B" Mill Evaporator building foundation looking N.E.
Lagoon site from N.E. corner looking south.
Recaust G.L.C. Tank looking N.E.
Fiber Salvage Sump "A" Mill Machine Room looking N.E.