Lagoon site from MCC location looking S.W. by W.
Lagoon site from MCC location looking West.
Defective weld on Bleach Washer Inlet Vat.
Lagoon from S.E. corner looking N.
Lagoon rip-rap on S. Dyke from S.E. Corner looking S.E.
Lagoon site from MCC location looking S.E. by E.
Lagoon rip rap on S. Dyke looking S.E.
Lagoon Wier Box from S. ridge looking N.W.
"42" FRP Lagoon inlet pipe at splitter box end looking N.E.
No. 2 Turbo-Generator foundation looking S.W.
"B" Mill Evaporator building foundation looking N.E.
Lagoon site from N.E. corner looking south.
Recaust G.L.C. Tank looking N.E.
Fiber Salvage Sump "A" Mill Machine Room looking N.E.
"B" Mill Power Group from Track #14 looking N.W.
Fiber Salvage Sump "A" Mill Machine Room looking S.
Trussed girt on W. wall of "B" Mill pulping group looking S.W.
New Lime Kiln piers from Track #14 looking N.W.
"B" Mill Pulping Group at N.W. corner looking N.E.
"B" mill Power Group from roof of Recaust building looking N.E.
Lagoon site, organic overburden from about N24+00 and E49+50 looking S.W.
No. 2 Turbo Generator building from roof of #20 Caustic Tower looking E.
"B" Mill Machine Room from roof of "A" mill Blending Tank looking N.W.
Lagoon site from S.E. corner of existing lagoon looking S.
Lagoon site from S.W. corner of existing lagoon looking S.W.
Lagoon site from top of sand stock pile looking N.W.
"B" Mill machine Room from near Sub-station looking S.E.
Lagoon site from N23+30 and E41+80 looking S.E.
Lagoon site from N23+30 and E41+80 looking S.E.
Steel topped out "B" mill Pulping Group from locker room looking S.E. - 2:00 PM
Lagoon site from N23+30 and E 41+80 looking E.
"B" Mill Power Group from Track #14 looking N.W.
Trailer load of stell for "B" mill Pulping Group W. side looking E.
Lime Rock conveyor from S.E. corner looking N.W.
Vacuum blower in Machine Room looking S.W.
Vacuum blower in Machine Room looking N.E.
Depositing over burden and silt at worked out section of gravel pit looking S.
Lagoon site from N23+34 & E41+82 looking S.
35 ton machine room crane at storage near camp looking SE.
Lagoon site from N32+34 & E41+82 looking SE.
"B" mill pulping group from near woods div. bldg. looking SE.
"B" mill machine room operations floor from roof of "A" mill blending tank looking NW.
Lagoon site from N19+00 & E46+00 looking W.
30" EMUC-36-060 and 30" EC-36-040 from S. chip conveyor bent looking N.
Temporary construction XFMR at SE corner of "A" mill power group looking NW.
"B" mill power group from track #14 looking NW.
Lagoon site from NE. corner looking SE. by E.
Lagoon site from N23+34 & E41+82 looking SE.
Lagoon site from N23+34 & E41+82 looking W.
Lagoon site from SE. corner looking N.