Chip truck dump excavation from top of "A" mill digester looking S.
42" EAS-36-001 near E. mis-match of pipe & ell looking upstream.
New lime kiln foundations from track #14 looking NW.
Utility bridge bent #B7 looking NW.
No. 2 turbo-generator building from roof of recaust building looking N.
Looking S. along track #9 from about N.
8" EMUC-36-070 and 6" WMC-36-147 at N. wall of new filter building looking E.
Lime kiln building extension from NE. corner looking SW.
10" WFP crossunder at 42" EAS-36-001 at N54+79.5.
Construction workers using main gate.
10" WFP crossunder at 42" EAS-36-001 looking NE.
Utility bridge bent #B5 looking SW.
Gas riser at SE. corner of new green liquor clarifier building looking E.
Suspended slab SE. corner "B" mill mach. rm. looking N.
Suspended slab SE. corner "B" mill mach. rm. looking N.
Mill water line at trench excavation for 42" EAS-36-001 at N54+45.
Lime kiln bldg. addition from NE. corner looking SW.
"B" mill machine room from SE. corner ground level looking NW.
"B" mill pulping group from near SW. corner looking NE.
Foundation for #1 chip dumper from NE. corner looking SW.
Trench for 42" EAS-36-001 from about N. 50+00 looking S.
"B" mill machine room start of roof deck installation from near column Mx-74B looking NE.
Mired pickup at brocker P.I.V. in camp looking SE.
Broker P.I.V. under truck in camp.
30" EC-36-040 from SW corner of "B" mill pulping group looking N.
Black liquor storage tanks from roof of "A" mill bleach plant N. end looking NE.
60" chip conveyor foundation excavation on W. side of existing chip silos looking NE.
42" EAS-36-001 at S. limit of contract 401 looking N.
Putrescible dump from SW. bank looking N.
"B" mill pulping group from roof of chemical unloading shed looking W.
"B" mill pulping group from roof of chemical unloading shed looking SW.
"B" mill blending tank & broke tank foundation looking E.
"B" mill power group looking SW.
Foundations fof #2 turbo-generator building from roof of #1 turbo-generator building looking NW.
Recaust building addition excavation from roof of #1 turbo-generator building looking SW.
View of new bridge approach from top of "A" mill digester looking E.
"B" mill machine room from top of "A" mill digester looking N.
Utility bridge bents #T1 & #T2 from top of "A" mill digester looking N.
Recaust building addition excavation from top of "A" mill digester looking E.
Tracks #9, 9A & 9B from top of "A" mill digester looking SE.
Foundations for #2 W.W.S. and W.W.L. storage tanks from SE corner looking NW.
"B" mill power group from roof of existing lime kiln building looking N.
Footings along W. wall of recaust building from N. end looking SE.
8" EMUC-36-070 and 6" WMC-36-147 at N. wall of new filter building looking SW.
M.H. #1D on 12" EMUC-36-066 looking SE.
A&B rails mechanical tamper on track #5A about N. 65+00.
Foundation for soap storage tank lookins SW.
Utility bridge towers #T1 and #T2 from NW. corner looking SE.
Recaust building addition from roof of #1 T.G. building looking SW.
8" EMUC-36-070 and 6" WMC-36-147 from NE. corner of new filter building looking NE.